LIVOLTEK Hyper 2000 Скачать руководство пользователя страница 1

Operating Manual 

Low Voltage Hyper Series 

 

Version: HYPER-LV-1P-AU-1.1

4

 

Содержание Hyper 2000

Страница 1: ...Operating Manual Low Voltage Hyper Series Version HYPER LV 1P AU 1 14...

Страница 2: ......

Страница 3: ...5 2 Mounting the Inverter 14 6 Electrical Connection 16 6 1 Wiring Diagram 16 6 2 Overview of the Connection Area 17 6 3 PV Connection 18 6 4 Grid Connection 19 6 5 EPS Connection 20 6 6 Battery Conn...

Страница 4: ...in this manual These important instructions must be followed during installation operation and maintenance of the inverter Indicates a hazard with a high level of risk that will result in death or ser...

Страница 5: ...nce at all times 2 2 Important Safety Instructions Danger to life from electric shock Before performing any work on the inverter disconnect all DC and AC power from inverter and wait for at least 5 mi...

Страница 6: ...nded The frames of PV panels should be grounded for safety reasons Do not open inverter cover or change any components without authorization otherwise the warranty commitment for the inverter will be...

Страница 7: ...4 3 Scope of Delivery A B C D E F 1 2 3 4 5 6 7 8 G H I J K L M...

Страница 8: ...Phoenix or Wieland E 2 or 4 PV Connectors Amphenol HC4 or Multi Contact MC4 F 1 WiFi Stick G 1 Smart Meter H 3 Terminal Resistor 240 Ohm 120Ohm 1kOhm I 1 Smart Meter Cable J 1 Water proof RJ45 Connect...

Страница 9: ...EK inverter are ahead of the field and should be understood prior to install 4 1 View of the Inverter Figure 1 View of the Hyper Series Hybrid Inverter Position Designation A LEDs The LEDs indicate th...

Страница 10: ...Surface Refer to the Operating Manual 5min Danger Risk of Electric Shock due to Stored Energy Cut off all power and wait at least 5 minutes before any work is carried out on the inverter G83 G59 G83 o...

Страница 11: ...he purpose is to increase self consumption of clean PV energy When Inverter is set to work in this mode i During daytime and there is sufficient PV Power The PV energy is used to supply local loads as...

Страница 12: ...harge the battery If grid failure can be a common occurrence in your area you can adjust the DischargeEndSOC Grid higher to ensure there is battery power available iv You can also Set a schedule for t...

Страница 13: ...When the battery SOC is below the DischargeEnd SOC EPS value the inverter will disconnect power to the EPS port All energy from PV will be used to charge the battery until the SOC reaches the EPS res...

Страница 14: ...shutdown and restart For off grid back up operating mode one should set a higher DischargeEndSOC Grid value above 50 for example So that there will be some energy in battery when a grid failure occur...

Страница 15: ...ain exposure No snow lay up Direct sunlight Rain exposure Snow lay up Unsafe due to assessment of occupational health safety risks The ambient temperature is outside the range of tolerable ambient tem...

Страница 16: ...unlight or in an enclosure exposed to direct sunlight Little or no air flow Mounted on a surface without suitable fire heat rating Mounted on a wall without suitable load bearing capability High humid...

Страница 17: ...rter must be mounted in upright position with a maximal tilt angle of 15 degree Minimum clearances around inverter should be applied as the following figure shown STEP 1 Please use the wall mounting b...

Страница 18: ...EP 2 Use expansion bolts or correct wall fixings to attach the mounting bracket to the wall tightly STEP 3 Lift and hang the inverter on the bracket STEP 4 Peel off the protective film on the front su...

Страница 19: ...Wiring Rules Because the inverter does not maintain neutral integrity an external neutral connection must be used in Australia and New Zealand 30mA Type A RCD can be used where required by AS NZ 3000...

Страница 20: ...S DRM EPS GRID Multi BMS Position Designation a Battery Connectors b PV Inputs c DC Switch optional d DRM Port e MULTI Port for Meter Other Communications f EMS Port for WiFi Stick or other EMS Contro...

Страница 21: ...3 68kW 5kW inverter is designed with 2 MPPT trackers if the inputs of the PV panels are paralleled please consult with your local distributor for technical support If the inverter is equipped with an...

Страница 22: ...re The grid voltage and frequency must be in the permissible range An external AC switch 40A must be used on the Grid connection to cut the inverter off from the Grid when necessary Procedure STEP 1 A...

Страница 23: ...e install an external switch to bypass the inverter to power backup loads in the event of inverter failure Before connecting please check the following The grid voltage and frequency must be in the pe...

Страница 24: ...e use the pre assembled battery power wire in the accessory box for connection STEP 2 The connector from wire to battery is not assembled you need to contact with your battery vendor for detailed info...

Страница 25: ...e please confirm with your battery vendor Procedure STEP 1 Please insert the RJ45 connector with water proof cap into the port marked with BMS on inverter and fasten the cap STEP 2 Please insert the o...

Страница 26: ...ccordingly If the cable length is not enough please use the RJ45 extender in accessary box to extend the cable 3 different terminal resistors 240Ohm 510Ohm 1kOhm are provided with the smart meter If y...

Страница 27: ...24 Smart meter type CHINT DDSU666 D 1 2 3 4 5 6 7 8 L From Grid N 485A 485B Smart Meter Cable To Inverter Loads L N...

Страница 28: ...STEP 2 Insert the WiFi stick to the EMS port and fasten the two screws tight 6 9 DRM Connection DRM is provided to support several demand response modes by certain control signals DRM Connector Pin D...

Страница 29: ...been powered up Red LED Glowing An Error has occurred Blue LEDs Full Length SOC 75 3 Bars 75 SOC 50 2 Bars 50 SOC 25 1 Bar 25 SOC 10 No Light SOC 10 or BMS not Connected The graphical display shows t...

Страница 30: ...l not be shown I Total PV power generation J Default as current time when an error occurred fault code will be displayed alternatively K Default as current date when an error occurred fault code will...

Страница 31: ...d check for the connections of grid power line and smart meter STEP 2 Power on the Battery The battery icon and its parameters should be shown on the screen If the SOC of the battery is greater than 1...

Страница 32: ...edure and get the test results Refer to LIVOLTEK APP Operation Instructions for details 7 3 Decommission STEP 1 Turn off the load STEP 2 Turn off the PV STEP 3 Turn off battery STEP 4 Turn off the mai...

Страница 33: ...ower APP Home Page Parameter Display Settings Inverter List Inverter Status Overview Grid Status EPS Status Smart Meter Status PV Status BMS Status Energy Today Energy Total System Status Basic Settin...

Страница 34: ...TEP 2 Connect to the inverter Connect the mobile phone or pad to the same wireless network WiFi of the inverter Open the APP click the arrow on the upper right corner of home page Search the inverter...

Страница 35: ...ick the Basic Settings Write in the password to enter the setting interface This can be accessed by contacting LIVOLTEK STEP 2 Set the country Check the Country make sure it is your current location I...

Страница 36: ...33 7 4 4 Time Synchronization Procedure STEP 1 Enter the Setting interface Go to Settings interface click Inverter Commands STEP 2 Time Synchronization Click the Time Date Sync...

Страница 37: ...the Setting interface Go to Settings interface click the Basic Settings STEP 2 Set the number of paralleled batteries Click the Battery BMS Write in the number of paralleled batteries Click Apply to...

Страница 38: ...peration Periods and Parameter Enable the Scheduled Operation Set the operation period and parameters according to your requirement One can also set the discharge period for the EPS mode if necessary...

Страница 39: ...Procedure STEP 1 Enter the Setting interface Go to Settings interface click the Basic Settings STEP 2 Max Charge Discharge Current Click the Battery BMS Set the max charge discharge current according...

Страница 40: ...e errors will reset itself If it keeps coming and finally the Inverter is latched up please contact with your local distributor F1 00000800 AC OCPs F1 00001000 DC Component of AC Current Abnormal F1 0...

Страница 41: ...00002 BMS Internal Fault F3 00000004 BMS OVP F3 00000008 BMS UVP F3 00000010 BMS Charge OCP Check the battery for parameter settings Contact with your local battery s distributor F3 00000020 BMS Disch...

Страница 42: ...olation for PV Modules Transformerless Reverse Current to PV Panels No AC Ratings Hyper 2000 Hyper 3000 Rated AC Power 2000VA 3000VA Rated AC Voltage 230V a c AC Voltage Range 180V 264V a c Rated AC F...

Страница 43: ...1 2000W 3000W Galvanic Isolation for Battery YES Communication Interfaces CAN RS485 Efficiencies Hyper 2000 Hyper 3000 MPPT Efficiency 99 9 99 9 Euro Efficiency 97 0 97 0 Max Efficiency 97 5 97 5 Max...

Страница 44: ...41 Ingress Protection IP65 outdoor Protective Class I Over Voltage Category III mains II PV Pollution Degree III Cooling Method Natural Noise Level 40dB...

Страница 45: ...V Modules Transformerless Reverse Current to PV Panels No Max AC Current to Grid Feed Back Current Max AC Current from Grid Bypass Grid Charge Max Output Overcurrent Protection Power Factor Range 0 8...

Страница 46: ...on for Battery YES Communication Interfaces CAN RS485 Efficiencies Hyper 3680 Hyper 4600 Hyper 5000 MPPT Efficiency 99 9 99 9 99 9 Euro Efficiency 97 0 97 0 97 0 Max Efficiency 97 5 97 5 97 5 Max PV t...

Страница 47: ...III Cooling Method Natural Noise Level 40dB 9 3 Certificates and Grid Regulations EMC EN61000 6 1 EN61000 6 2 EN61000 6 3 EN61000 6 4 EN61000 4 16 EN61000 4 18 EN61000 4 29 Safety IEC EN62109 1 2 IEC6...

Страница 48: ...45 Contacts Hangzhou Livoltek Power Co Ltd Address 1418 35 Moganshan Road Hanghzou 310011 China Tel 86 571 28330320 Fax 86 571 28020357 Email info livoltek com...

Отзывы: