4
a
Input terminals of the PV inverter apply only to input terminals of PV String do not connect
.
;
any other DC source to the input terminals.
b
Before connecting PV modules ensure that is its voltage is within the safe range when
.
,
;
exposed to any sunlight, PV modules can generate high voltage.
c
All electrical connections must meet the electrical standards of the country or region
.
.
.
,
,
d
Cables used in electrical connections must be well fixed good insulation and with
appropriate specification.
1 4 Electrical Connections
.
A
Before getting the permission of electrical power sector in the country/region the grid-tied
.
,
PV inverter cannot start generate power.
b
Follow the procedures of commissioning described in the user manual when commissioning
.
the PV inverter.
c
Do not touch any other parts surface except the DC switch when the PV inverter is operating
.
'
;
its partial parts will be extremely hot and can cause burns.
1 5 Operating and Commissioning
.
1 6 Maintenance
.
Before installing the inverter check all electrical ports to ensure no
,
damage and no short circuit Otherwise personal casualty and or fire
.
/
will occur
.
While the inverter operating high voltage can lead to an electrical
,
shock hazard and even cause personal casualties Therefore
,
.
,
operate the PV inverter strictly according to the safety precautions in
the user manual
.
Power OFF all electrical terminals before the inverter maintenance
;
strictly comply with the safety precautions in this document when
operating the inverter
.
DANGER
DANGER
DANGER
Содержание GT1-3K-S
Страница 1: ...Ver 00 GT1 3K 6K...