Small Cape Cod Manual
Construction Manual © 2007 - 2008 Little Cottage Co. Page 11
61
62
63
64
65
66
Install the caps as shown. When you reach
the end you can use only the exposed part
of the shingle to give it a nice finish. For
Example: The cap would then be cut in
half for this.
Check the layout diagram for correct measurements for
your size building. Measure from the edge of the building
to edge of the treated dormer frame. There is a cut angle
right where the fingers and tape are in the picture. Make
sure this angle is turned up and not down toward the roof.
Measure from the bottom up, the edge of
the roof to the base of the dormer frame.
Make a small pencil or chalk mark once
you have positioned the base.
Once you have the correct position apply
caulk to the bottom of the base. Make sure
it is the bottom!
Screw the bas into the roof. You can use 2
1/2” screws. Be sure to check on the inside
and break off the screw that is exposed.
Make sure the frame is square.