4
When the LED driver power is less than the emergency power (40W)
BEFORE BEGINNING INSTALLATION, TURN OFF POWER AT THE CIRCUIT BREAKER.
1.
Choose a location for the Emergency Battery Backup unit. The indicator light/ test switch should
be mounted where they can be easily seen by inspectors.
2.
The input voltage to the dimmable wires (DIM+, DIM-) of the EB40 must be less than 20Vdc.
3.
Once mounted, select the appropriate wiring diagram to connect the EB40 to the AC driver. Use
wirenuts to cap unused wires and make sure all connections are in accordance with the NEC and
any local regulations.
4.
Restore power to the fixture. When power is received, the red indicator light should appear,
indicating that the unit is charging. An initial full charge could take up to 24 hours.
INSTALLATION
WIRING DIAGRAMS
Emergency
LED
Driver
EMAXXFY Series
Rev
:
V02
pg2
A: For 30 seconds/Off
B: For 90 minutes
In AC operation, press test switch or “A” on remote test switch, the fixtures will switch into emergency model
for 30 seconds.
In AC operation, press “B” on remote test switch, the fixtures will switch into emergency model for 90 minutes.
In emergency operation, 30 senconds later, press “A” on remote test switch 10 seconds later, the fixtures will
switch into AC model.
The antenna shall be extended before test, the remote signal could reach about 12M.
*When the led driver power less than the emergency power
Wiring Diagram
A)Normal
USE WIRE NUTS TO COVER
UNUSED WIRES
WHITE
AC
-
N
AC
-
N
AC
-
L
AC
-
L
BLACK
BLACK/WHITE
ORANGE
PINK
CHARGE
INDICATOR
CHARGE
INDICATOR-
TEST
SWITCH
KIT
BROWN
BLUE
DRIVER N
DRIVER L
PURPLE
GRA
Y
YELLOW
RED
CHARGING
INDICATOR
TEST
SWTCH
Driver L
Driver N
Сharging
Indicator
Сharging
Indicator-
Test Switch
Wall Switch
Connect to
Connect to
Connect to
Connect to
Connect to
Connect to
Connect to
Connect to
LED
LAMP
with
internal
driver
LED
TUBE
No connect
WALL
SWITCH
GR
AY(-)
PINK(-)
)