![Lindsay Barrier Systems X-LITE Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/lindsay/barrier-systems-x-lite/barrier-systems-x-lite_installation-manual_1919635013.webp)
Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
13
Step 3 – Install Ground Strut Assembly
Components required:
• (2) Tension Rods – BSI-1012097-00
• (1) Ground Strut Angle – BSI-1012098-00
Hardware Required:
• (4) 5/8” Guardrail Nut - 4001116
9. Install tension rods between Posts 1 and 2 by
sliding the rods through the openings on the
bottom of Post 2.
10. Secure the rods at Post 1 by passing the rods
through the small piece of angle with the angle
sitting flush on the ground just above the crimp
on the post.
The small piece of angle will sit flush with the
ground on 28” systems only. On 31” height
systems, the small piece of angle will sit
approximately 3” (75mm) off the ground.
11. Tighten the rods so that there are equal amount
of threads exposed at both ends of the rods.
Note:
Post 2 includes a blockout while Post 1
does not; this creates a curve in the tension rods
once installed.
POST 6
GROUND STRUT ASSEMBLY BETWEEN POSTS 1 AND 2
POST 1
POST 2
POST 3
POST 4
POST 5
POST 7
REV.
A
B
C
D
A
B
C
D
1
2
3
4
1
2
3
4
Doc. B100108
SHEET
1:50
B
SIZE
SCALE
BSI-1102002-00
DWG NO.
2 OF 2
B
POST 6
POST 2
POST 1
POST 3
NO BLOCKOUT ON POST 1
POST 4
POST 5
POST 7
194
7 5/8"
POST 7
POST 6
POST 1
POST 2
POST 3
POST 4
POST 5
RAIL DOES NOT ATTACH TO POSTS 3 OR 5
POST 7
POST 1
POST 2
POST 3
POST 4
POST 5
POST 6
RAIL 3
RAIL 2
RAIL 1
Tension Rods Installed at Post 2
Tension Rods Attached at Post 1
Slight Bend on Tension Rods
X-LITE
®
FLARED END TERMINAL