A-3
INSTALLATION
SP-100T
A-3
SP-100T
4
5
8
3
6
7
1
2
DO NOT SWITCH
WHEN WELDING
+
-
FIGURE A.2
Work Clamp Installation
Attach the work clamp per the following:
1. Unplug the machine or turn the power switch to the
“
OFF
”
position.
2. Insert the work cable terminal lug with the larger
hole through the strain relief hole in the work clamp
as shown in Figure A-3.
3. Fasten securely with the bolt and nut provided.
FIGURE A.3
SELECT SUITABLE LOCATION
Locate the welder in a dry location where there is free
circulation of clean air into the louvers in the back and
out the front of the unit. A location that minimizes the
amount of smoke and dirt drawn into the rear louvers
reduces the chance of dirt accumulation that can block
air passages and cause overheating.
STACKING
SP-100T
’
s cannot be stacked.
TILTING
Each machine must be placed on a secure, level sur-
face, either directly or on either recommended cart.
The machine may topple over if this procedure is not
followed.
OUTPUT CONNECTIONS
Refer to Figure A.2.
1. Work Cable Access Hole.
2. Gun Cable and Control Lead Access Hole.
3. Connector Block.
4. Gun Trigger Lead Connectors.
5. Positive (+) and negative (
–
) output terminals.
6. Wire Feed Gearbox.
7. Cable Hanger.
8. Thumbscrew.
Strain Relief Hole
Nut & Bolt
Work Clamp
Work Cable
Содержание SP-100T
Страница 20: ...B 7 APPLICATION CHART B 7 SP 100T ...