A
B
C
A
B
8
With run time confirmed, select
Δ
or
∇
to verify sensor use
(
Fig. 24 A
). Press
Δ
or
∇
until
nO
appears in display.
Green LED flashes next to
PROXY 1
indicating sensor
part of setup procedure.
9
Press
ENTER
to select
nO
and
PROXY 1
will not be setup
(
Fig. 24 B
).
10
Press
ENTER
again on setup procedure to omit
PROXY 2
and
green LED on
RESERVOIR
begins to flash.
11
Push
ENTER
to confirm
nO
for low level monitoring (
Fig. 24 C
).
12
L - F
(lamp flashing) displays. This option is used with external
warning lamp. Typically, if monitoring is installed, this function is
used. Press
Δ
and change status from
L - F
(lamp flashing) to
L - S
(lamp static).
L - F
is a pulsed output supply and
L -S
is a
constant output supply.
13
With no monitoring used, press
ENTER
with either choice
selected to move to next part of programming (
Fig. 25 A
).
14 tSt
(test mode) appears in display indicating test mode of setup
procedure. Press
Δ
for pump to start turning (
Fig. 25 B
). Correct
pump from turning in wrong direction by changing polarity of
wiring.
15
If all is correct, turn off power supply to controller.
Fig. 24
Fig. 25
NOTE
tSt
must appear on display before switching off power to unit.
System does not save changes if power to unit is turned off
during any part of programming.
tSt
must appear on display for
changes to be confirmed.
12
13