Retur
n to Section TOC
Retur
n to Section TOC
Retur
n to Section TOC
Retur
n to Section TOC
Retur
n to Master TOC
Retur
n to Master TOC
Retur
n to Master TOC
Retur
n to Master TOC
LN-742 & LN-742H
SWING ARM ASSEMBLY REPLACEMENT FOR
FOUR-ROLL WIRE FEEDERS
ELECTRIC SHOCK
can kill.
• Observe all safety precautions detailed throughout this manual.
Turn off input power to the wire feeder. Only qualified technicians
should perform installations, maintenance, and troubleshooting
work on the machine.
TOOLS REQUIRED
3/32 in. Allen wrench
9/64 in. Allen wrench
Adjustable pliers
Rubber mallet
WARNING
F-28
TROUBLESHOOTING AND REPAIR
F-28