A-8
INSTALLATION
POWER WAVE® AC/DC 1000
A-8
STEP BY STEP INSTALLATION CHECKLIST
SINGLE ARC SYSTEM CHECKLIST
– (PF-10A CONTROLLED, 1 POWER SOURCE)
(as shown in the Connection Diagram "Typical Single Arc System")
Place Power Wave in suitable operating location.
Mount PF10A Controller.
Install PF10S Wire Drive and other accessories in their operating location.
Connect K1785-xx Wire Feeder Control Cable (14 pin) between the Power Wave and Wire Drive.
(1)
Connect K1543-xx ArcLink Control Cable (5 pin) between Power Wave and PF10A.
(1)
Configure / Install sense leads.
Connect / Install welding cables per recommended "Output Cable Guidelines."
Open all Power Wave front panel and configure DIP switch settings per "Internal Controls" section.
Connect input power to Power Wave per recommended guidelines.
Turn on Power Wave, and verify all system Status Lights are solid green.
NOTES:
(1) ArcLink and Wire Feeder control cable connections are only required at the Master power source of each
arc grouping. For additional information see the "Extra Capacity Parallel Connection Checklist."
Содержание Power Wave AC/DC 1000
Страница 6: ...v SAFETY v ...
Страница 7: ...vi SAFETY vi ...
Страница 43: ...B 5 OPERATION B 5 POWER WAVE AC DC 1000 8 12 7 11 9 10 4 5 13 14 6 15 FIGURE B 5 ...
Страница 68: ...F 3 AC SWITCH WIRING DIAGRAM F 3 POWER WAVE AC DC 1000 ...
Страница 69: ...F 4 AC SWITCH WIRING DIAGRAM F 4 POWER WAVE AC DC 1000 ...
Страница 70: ...F 5 DIMENSION PRINT F 5 POWER WAVE AC DC 1000 L12302 A 01 19 70 19 16 9 56 18 84 40 94 43 44 33 00 34 34 14 62 ...
Страница 71: ...NOTES POWER WAVE AC DC 1000 ...