B-11
OPERATION
B-11
MULTIPLE ARC AC ADJUSTMENTS FOR
SYSTEMS EQUIPPED WITH K2282-1
SYSTEM INTERFACE
Phase
The
phase relationship
between the arcs helps to
minimize the magnetic interaction between adjacent
arcs. It is essentially a time offset between the wave-
forms of different arcs, and is set in terms of an angle
from 0 to 360°, representing no offset to a full period
offset. The offset of each arc is set independently
with respect to the lead arc of the system (ARC 1).
Recommendations:
• For balanced waveforms a phase relationship of 90°
should be maintained between adjacent arcs.
ARC 1
ARC2
ARC3
ARC 4
2 Arc System
0°
90°
X
X
3 Arc System
0°
90°
180°
X
4 Arc System
0°
90°
180°
270°
• For unbalanced waveforms:
– Avoid switching at same time
– Break up long periods of unchanged polarity
relative to adjacent arcs
POWER WAVE® AC/DC 1000
Phase Relationship
500
-500
0
Use Phase Relation ship to min imize arc blo w
in multip le arc systems.
(Balanced two arc syst em sh own)
0°
(PULL)
90°
(PUSH/PULL )
180°
(PUSH)
BAD
GOOD
BAD
ARC 1
ARC 2
Best result s obtained by alternating and equalizing the dur ation of
magnetic for ces between adjacent arcs.
Содержание Power Wave AC/DC 1000
Страница 6: ...v SAFETY v ...
Страница 7: ...vi SAFETY vi ...
Страница 43: ...B 5 OPERATION B 5 POWER WAVE AC DC 1000 8 12 7 11 9 10 4 5 13 14 6 15 FIGURE B 5 ...
Страница 68: ...F 3 AC SWITCH WIRING DIAGRAM F 3 POWER WAVE AC DC 1000 ...
Страница 69: ...F 4 AC SWITCH WIRING DIAGRAM F 4 POWER WAVE AC DC 1000 ...
Страница 70: ...F 5 DIMENSION PRINT F 5 POWER WAVE AC DC 1000 L12302 A 01 19 70 19 16 9 56 18 84 40 94 43 44 33 00 34 34 14 62 ...
Страница 71: ...NOTES POWER WAVE AC DC 1000 ...