3.8 Fill the Reservoir
Unscrew the cap from the top of the Additive Reservoir.
Pour 2 quarts (1.8 liters) of approved FineLine Premium Piercing Additive
(BK300372) through a funnel and into the reservoir. The full level is the bottom
of the reservoir neck.
Replace the reservoir cap.
3.9 Commissioning
Once the APC has been installed and all connections have been made, the System
needs to be commissioned to include the APC before operation.
Refer to the FineLine Plasma System manual for your specific System and follow the
commissioning procedure.