A-10
INSTALLATION
DUAL MAVERICK
®
450
CONNECTION OF WIRE FEEDERS WITH CONTROL
CABLE (14 PIN)
Shut off welder before making any electrical connections.
CONNECTION OF LF-72, LF-74, FLEX FEED 74 HT,
FLEX FEED 84, LN-25 PRO DUAL POWER TO THE
DUAL MAVERICK
®
450
Note: The Dual Maverick 450 can operate two different wire
feeders at the same time.
•
Shut the welder off.
•
Set the “WIRE FEEDER VOLTMETER” switch to either “+” or
“-” as required by the electrode being used.
•
For electrode Positive, connect the electrode cable to the "+"
terminal of the welder and work cable to the "-" terminal of
the welder. For electrode Negative, connect the electrode
cable "-" terminal of the welder and work cable to the "+"
terminal of the welder.
•
Using the display Set "MODE" to MIG/FCAW.
•
Adjust the “PINCH” setting to desired Crispness. SOFT for MIG
and CRISP for Innershield.
•
Set the "Weld Output Override" to the desired settings using
the display.
•
Connect the 14 pin control cable from the wire feeder to the
engine drive (See Figure A.5).
•
This procedure can be done for both “Single” and “Dual”
operator modes.
WARNING
ENGINE WELDER
K1797-xx
CABLE
K1797-xx
CABLE
WIRE FEEDER
A
Operator
A
Operator
B
WIRE FEEDER
B
FIGURE A.5