B-2
OPERATION
B-2
x
LWF
™
-24 PLUS:
Loosen the retainer on the spindle and put on the welding wire spool. Next, replace the retainer and
tighten the screw. Release the pressure handle and lift the pressure arm, insert the welding wire into
conduit and V groove of feed roll, then insert it into the feedplate. Then insert the welding wire into V
groove of another feed roll and contact tip. Push down the pressure handle at last. Adjust the pressure
to feed wire smoothly. Then using the cold-inch button on the feeder, begin feeding wire. Release the
cold-inch button when the wire comes out 1-2cm (1/2-1 inch) from the contact tip. The installation of the
welding wire is now completed.
Содержание 76202
Страница 12: ...D 1 SCHEMATIC DIAGRAM D 1 ...