Linak Desk Frame 1 Скачать руководство пользователя страница 19

19

M

ad

e i

n t

he U

SA

TROUBLESHOOTING 

 
 
Glossary of Common Terms

• Components

» 

Desk leg (DL)

 – The lifting columns, typically with powder coated steel profiles, responsible for lifting the working load of  

  

the  application.

» 

Control box (CBD6S)

 – Both the computer and power supply of the system.

» 

Desk switch (DP)

 – The user interface. Depending on the model, it is used to activate the application, set memory  

  

positions, display the height, display error codes, connect to mobile apps, and give reminders to the user.

» 

Motor cable 

– Transmits low voltage power (18-39 VDC) from the control box to the desk legs, and also transmits PIEZO  

  

signals when available from the desk leg.

» 

Mains cable 

– Transmits high voltage power (120 VAC in US and Canada) to the control box.

• Other

» 

Initialize

 – Procedure to reset all desk legs to the fully retracted position so that the control box knows where they are.

» 

Reference

 – Any group of desk legs that run in parallel when an Up or Down command is sent to the control box. It is  

  

possible to have a custom control box configuration that allows for more than one Reference. [Example: Two (2) desk  

  

legs on Reference #1 (Channels #1 and #2) to lift a work surface, and one (1) LA31 on Reference #2 (Channel 3) to adjust  

  

a monitor array.]

Standard Troubleshooting Procedures

P1 – Initialize the control box (“reset”)

Note: This is commonly the solution when a complaint is that a desk will move down but not up. When a control box requires 
initialization, this is how the system is programmed to behave.

STEP 1

.  Hold Down button on desk switch to ensure the desk is retracted to its lower limit (whether it’s the fully retracted hard  

 

 

stop, or a configured lower limit).

STEP 2

.  Briefly release Down

STEP 3

.  Press and hold Down for 5 seconds, wait until all desk movement has stopped, then release 

  

a.

  If initialization is successful, you should see a slight up/down “handshake” movement of the desk legs

  

b.

  If you have a desk switch with display, you should also see E01 during this part of the procedure.

P2 – Check all cable connections

STEP 1

.  Mains cable, connected to both the control box and power outlet.

STEP 2

.  All motor cables, connected to both the control box and desk leg.

  

a.

  Assuming a standard control box configuration, these must be connected in channels 1 and 2, or channels 1, 2 and  

  

 

3 for a 3-leg table.  They can’t be connected in channels 1 and 3 or 2 and 3 unless there is a configuration on the  

  

 

control box specifying this arrangement.

STEP 3

.  Desk switch cable, connected to the control box in either port A1 or A2 (doesn’t matter which).

Содержание Desk Frame 1

Страница 1: ...DESK FRAME 1 ASSEMBLY MANUAL DESK FRAME DESK FRAME...

Страница 2: ...2 Designed in Denmark...

Страница 3: ...e of LINAK products systems can affect the operation and durability of the products systems The products are not to be opened by unauthorized personnel The assembly manual has been written based on ou...

Страница 4: ...s Included in the Box 05 Hardware Packages 06 Product Ratings 07 Full Product Details 08 Tools Needed 08 Assembly Process 09 Getting the Most From Your New Sit Stand Desk 17 Benefits of Moving 18 Trou...

Страница 5: ...N THE BOX B Kick Click Frame 1 Clamp 2 Kick Lock 3 2 Cantilevers 4 Inner Rail 5 Outer Rail 6 2 Clips C Electronics Kit Control Box Desk Switch Cables Hardware pack Anticollision Desk Sensor Optional A...

Страница 6: ...tronics Hardware Pack 2 Desk Switch Flathead screws black finish 2 Control Box screws silver finish 2 Desk Frame Hardware Pack 1 Locking Clip for Rails 2 Kick Locks 13 20 8 15x0 75 Screws for table to...

Страница 7: ...lowed by 18 minutes of pause stated in the data sheets must NOT be exceeded as this will result in super heating of the motor the brake and the spindle nut Exceeding the duty cycle will result in a dr...

Страница 8: ...uct details see additional LINAK documentation Online Manuals Kick Click User s Manual Desk Troubleshooting Manual DL5 6 w CBD6S User s Manual Youtube Videos Assembling Your Desk Video Using Your DPG1...

Страница 9: ...ve blanket pad or cardboard box to protect the desk top during floor assembly Cordless Drill Optional Rubber Mallet Optional Phillips Head Drill Bit Optional Phillips Head Screwdriver 2 Gather all par...

Страница 10: ...as a length indicator frame width from 44 7 8 to 76 3 8 inches 3 2 Fix length with clip 4 Slide cantilevers over inner and outer rail tabs 5 Align cantilevers Align middle marker on cantilever with ce...

Страница 11: ...each side while centering the frame to the desired desktop 6 1 Screw cantilevers into top using tapping screw 6 2 Screw rails into top using tapping screws 6 3 Screw bases into top using tapping screw...

Страница 12: ...sible to move clamp a little after placement 7 3 Place kick lock in clamp Arrow on kick lock must face arrow on clamp 7 4 Fix kick lock in clamp with your foot When you hear a click columns are correc...

Страница 13: ...efs allow secure and flexible mounting options 9 3 Hide cables Rails are designed so cables from columns and control box can be hidden inside rail 9 2 Attach control box to table top using 2 screws At...

Страница 14: ...ten screws 10 2 Plug the desk switch into the control box This switch can be plugged into either port A1 or A2 DO NOT OVER TIGHTEN SCREWS 11 Flipping Your Desk Over WARNING 2 PERSON LIFT TO AVOID INJU...

Страница 15: ...again Hold for 5 seconds while the system initializes If no movement release and try again 13 3 Desk should run down into an end stop then automatically runs approximately 5mm out again Release desk s...

Страница 16: ...ject if a collision occurs during driving of the desk The DS1 is a small compact plug in adapter based on gyroscope technology and it detects even a little tilting of the desk when the desk is driving...

Страница 17: ...tay active Changing habits is not an easy task But there are ways to help develop healthy habits To support office workers LINAK made an extra effort to design user friendly office desk systems and mo...

Страница 18: ...flexible workstations Electric adjustable desks allow users to comfortably and quickly adjust to the task at hand by the touch of a button For instance if a colleague or a customer drops by it is no...

Страница 19: ...one 1 LA31 on Reference 2 Channel 3 to adjust a monitor array Standard Troubleshooting Procedures P1 Initialize the control box reset Note This is commonly the solution when a complaint is that a desk...

Страница 20: ...Channel 1 by itself The problem could be a faulty desk leg or a faulty motor cable Channel specific error Ex E41 Channel 1 overload Everything except PIEZO errors E59 E63 1 Swap the motor cable connec...

Страница 21: ...edure Desk is uneven 1 Initialize the desk If both legs begin to run down complete the initialization If only one leg moves stop and move to Step 2 2 Check motor cable connections Check to ensure moto...

Страница 22: ...ation of the application o Parallel even movement of all desk legs in the application is critical The control box does not directly know the position of each desk leg Instead the position of each leg...

Страница 23: ...23 Made in the USA...

Страница 24: ...2200 Stanley Gault Pkwy Louisville KY 40223 www linak us com...

Отзывы: