46
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Figure 33.
6. Reconnect the structure earth bonding cable to the lightning earth and measure and
record in column 5 the earth resistance reading.
7. Use a multimeter to measure the continuity between the inner and outer conductors of
the HVSC downconductor. The measurement should exceed 10,000 ohms.
8. Reconnect the HVSC lower termination to the lightning earth and re-seal the termination
using waterproofing tape to ensure that it is waterproof.
9. Report any problems arising from the above tests to your local LPI distributor for
further advice.
HVSC Downconductor
(Disconnected from
LP Earth)
Ground Resistance
Meter
LP Earthing System
Structure Earth Cable
(Disconnected from
LP Earth)
Figure 45.
Содержание Stormaster 15
Страница 1: ...HidgbVhiZg H LIGHTNING PROTECTION INTERNATIONAL PTY LTD ABN 11 099 190 897 www lpi com au...
Страница 3: ...Document 36 II Stormaster Version 1 02 Copyright 2008 LPI 1 Lightning Protection International Pty Ltd...
Страница 14: ...12 Document 36 II Stormaster Version 1 02 Copyright 2008 LPI Figure 8...
Страница 50: ...48 Document 36 II Stormaster Version 1 02 Copyright 2008 LPI Installation Notes...
Страница 51: ...Inside Back Cover Blank...