Locking Bracket

 

 

 
To install 

UV-DIRECT ....K 

series devices make a 

hole  with  dimension  as  in  the  table  on  the  false 
ceiling (fig. 3B). Insert the device into the hole as 
shown  in  Figure  3C.  The  ceiling  may  have  a 
thickness from 1 mm up to 40 mm. 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

Fig. 3C 

Fully open the locking brackets. Insert the unit into the hole in the 

ceiling, initially at one side, then pass the device on the other side. 

Hole for 

UV-DIRECT-E75H-K 

Fig. 3B 

Hole for 

UV-DIRECT-E40H-K 

Place the unit centered in the hole and close the two locking 

brackets by tightening the two screws (green). 

 

Содержание UV-DIRECT

Страница 1: ...LIGHT PROGRESS DIRECT H K eng gen 2021 Pag 1 16 UV DIRECT Germicidal UV C Device for Disinfection by Direct Irradiation MODELS UV DIRECT E40H K NX UV DIRECT E75H K NX...

Страница 2: ...re maintenance or cleaning ensure that the appliance is switched off and unplugged from the mains supply Should the appliance become faulty please contact our authorized Service Centre direct and in c...

Страница 3: ...it must follow the device in case of passage of property and accompany the device until its demolition To request the instruction manual updated and to ask all other information needed it s possible...

Страница 4: ...ple by means of a programming clock night op eration can be managed in the hours immediately prior to the entry of the operators to allow entry in a freshly disin fected site Operation can also be man...

Страница 5: ...ng and please be careful not to damage the con tents when using sharp blades or cutters to open the box Remove the unit from the box then inspect it immediately to ensure that no damage has occurred d...

Страница 6: ...te them uniformly in the environment to avoid the hidden areas such as the corners it should allow all the air to be treated These models can be mounted on the wall and still comply with the regular d...

Страница 7: ...the hole as shown in Figure 3C The ceiling may have a thickness from 1 mm up to 40 mm Fig 3C Fully open the locking brackets Insert the unit into the hole in the ceiling initially at one side then pas...

Страница 8: ...CTIONS We suggest you to let a qualified electrician to install this device following these instructions and the electrical scheme and following the CEI norms Make sure that the device will be install...

Страница 9: ...m contact can be powered by max 500mA of current and 24V of tension and can be connected to an electronic panel as MASTER ST control unit For this models see the numbering of the wires on the table be...

Страница 10: ...ends and pull it in a direction parallel to the tube Repeat the steps in reverse to insert the new lamp TROUBLESHOOTING UV LAMP See MAINTENANCE BALLAST All UV DIRECT models are supplied with electroni...

Страница 11: ...ainless steel AISI 304 All the used materials are tested for resistance to intense UV C rays Waterproof and dust proof IP 55 Powered with electronic ballasts specific for UV C rays lamps Reflector in...

Страница 12: ...request the return merchandise authorization RMA sending an email to in fo lightprogress it or calling the number 39 0575 749255 Once you receive the module it has to be filled up in every part and s...

Страница 13: ...hinery Guards General Requirements for the Design and construction of fixed and movable guards UNI EN ISO 13849 1 2016 Safety of Machinery Parts of the Control System related to the Safety Part 1 Gene...

Страница 14: ..._____________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ___________________...

Страница 15: ...____________________________________________ ____________________________________________________ ____________________________________________________ _________________________________________________...

Страница 16: ...g gen 2021 Pag 16 16 Loc San Lorenzo 40 52031 ANGHIARI AR ITALIA TEL 0575 74 92 55 FAX 0575 78 99 29 PRODUCTION ANGHIARI Loc San Lorenzo 40 CASTIGLION F NO Loc S Antonino 40 Http www lightprogress it...

Отзывы: