Group the three bit light cables together in between the following studs, then secure them
down by reconnecting the 1×2 tile and longer 1×8 tile on both sides. Ensure the three cables are
side by side and flat rather than over the top of each other.
Disconnect the tile with studs as well as the wireless connector tile, then bring the three cables
across toward the back. Lay 2 of them around studs before reconnecting the wireless connector
tile over the top. Bring the two cables along with the third cable toward the back and lay them
individually in between studs. Reconnect the tile with studs over the top.
Содержание 10270
Страница 1: ......
Страница 7: ......
Страница 8: ...Using your LEGO removal tool disconnect the following tiles and pieces ...
Страница 12: ...3 Turn the set around to the front again and reconnect the following bricksand pieces ...
Страница 17: ......
Страница 24: ...Disconnect the grey bricks from underneath the fire place then disconnect the trans orange flame piece ...
Страница 33: ......
Страница 35: ...Repeat this step to install another White 15cm Bit Light to the top of the right window frame ...
Страница 40: ...Tuck in any excess cable from the wireless connector to prevent it from dangling down ...
Страница 43: ......
Страница 50: ...Turn ON the power to test all the lights to this building are working OK ...
Страница 52: ......
Страница 59: ......
Страница 65: ......
Страница 84: ...Turn this section around to the front and secure any excess cable underneath the following tiles ...
Страница 88: ......