![Liftkar PT-Outdoor 120 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/liftkar/pt-outdoor-120/pt-outdoor-120_instruction-manual_1911268023.webp)
23
5 Preparations to be made before you start
5.1 Climber unit, battery pack and handle unit
The following preparations need to be
made to the Liftkar PT as a base unit:
1. Fit battery pack over the brown
contact housing on the climber unit
with the recess pointing towards
the handle mounting socket
(photo
1)
.
2. Insert the handle unit column into
the battery pack recess
(
photo
2
)
and into the mounting socket.
Press the handle unit down into the
mounting socket until the lever
screw on top of the control cluster
is pressed upwards
(photo 3
).
3. Tighten the lever screw clockwise.
4. Switch on the main switch (LED display should light up green).
5. Select climbing speed I-II-III
.
2
3
1