background image

 

Pro King 9XLT 

Jan. 2022 

17 

Maintenance Instructions   

Simple routine maintenance at low cost can ensure normal operation and safety of the machine. The frequency of 
routine maintenance may be determined on the basis of the frequency suggested as below and according to 
operating environment and times of the lift.     

6.1  Items to be checked before operation every day 

 

Operators must perform inspection before operating the machine. It is very important to check safety lock, which 
must be checked every day. Inspection in advance prevents serious loss, waste of time and personal injury. 

.  Check the locked status of the mechanical safety lock before and during operation. 

.  Check connection and possible leakage of hydraulic hose and connection. 

.  Check electric connection. 

.  Check whether anchors are tight (if anchored). 

.  Check connection of lifting / lowering brackets. 

6.2  Items to be checked weekly 

.  Check flexibility of moving parts. 

.  Check conditions of safety parts. 

.  Check volume of hydraulic oil by pressing the lifting button to raise the platform to the highest position. If it fails 

to reach that position, hydraulic oil in the oil tank is insufficient and shall be added. 

.  Check whether anchors are tight (if anchored). 

6.3  Items to be checked monthly 

.  Check whether bolts are tight. 

.  Check sealing of hydraulic system. If oil leakage is detected, tighten the joint. 

.  Check lubrication and wear of parts that need lubrication. Once any damage is detected, replace the damaged 

part promptly. 

6.4  Items to be checked yearly 

.  Drain the oil tank off to check status of hydraulic oil. 

.  Check lubrication and wear of parts that need lubrication. Once any damage is detected, replace the damaged 

part promptly. 

Note: If the machine is maintained in strict accordance with the aforesaid requirements, 
the machine will be in normal working conditions all the time and most of accidents can 
be avoided. 

Содержание Pro King 9XLT

Страница 1: ...Jan 2022 MOBILE 4 COLUMN PARKING LIFT Model Pro King 9XLT Installation Operation Manual...

Страница 2: ...e part 3 Installation Instructions 10 3 1 Preparation before installation 3 2 Cautions for installation 3 3 Installation procedures 3 4 Last check 4 Operation Instructions 15 4 1 Cautions for operatio...

Страница 3: ...nds and feet away when the machine is descending to avoid being crushed 1 3 5 Only personnel who have received professional training are allowed to operate and use the lift 1 3 6 Operators are not all...

Страница 4: ...t drain liquid at random in order to protect environment 1 4 Safety signs 1 5 Noise standard The lift makes noises less than75dB For your health it is suggested to provide a noise meter in your operat...

Страница 5: ...linder rod up pulling steel cable and hence raising tracks During lifting safety rack engages with safety lock automatically to make sure that no falling is caused by possible faults of the hydraulic...

Страница 6: ...Pro King 9XLT Jan 2022 6 Fig 7 Fig 8...

Страница 7: ...ro King 9XLT Jan 2022 7 2 3 Main structure chart 1 Control case mounting bar 3 Power unit Motor pump 4 Main platform 5 Wheel rack 6 Offside platform 7 Column and cap 8 Cross beam 9 Approach ramp Fig 9...

Страница 8: ...strength being above 3000psi and the thickness being 200mm or greater Within whole area the flatness error being less than 5mm Newly poured concrete shall be cured for more than 20 days in dry conditi...

Страница 9: ...Pro King 9XLT Jan 2022 9 Fig 10 Step 3 Unloading and unpacking Step 4 Set up of columns Fig 11 After unpacking set up the four columns as Fig 11 Fig 11 Main column with holes on base plate...

Страница 10: ...d let the crossbeam rest on 4th position Fig 15 5 Put in the nylon sliders and mount on the cover plate Fig 16 17 The slider with cut must be at the column cutting corner as in the picture Fig 12 Fig...

Страница 11: ...s as Fig 18 The one for main column is with holes Fig 21 2 Pull the cylinder to make sure that the cables are long enough 3 Put on the cable cut safe roller on the latch Fig 22a 4 Get the cables out f...

Страница 12: ...the motor pump on the bar by bolts and nuts also Fill about 12L of HM46 anti wear hydraulic oil into the oil tank Connect the hydraulic hose from motor pump to cylinder under main platform through a f...

Страница 13: ...position It will be stopped by the cylinder extension limit While rising the locks will knock the columns making Clang Clang noise It is normal that the sound may not synchronous It depends on the lev...

Страница 14: ...lowed where safety device is faulty 4 1 3 Check whether the center of gravity of the car to be lifted is at the center of the lifting platform If not please adjust the center of gravity before lifting...

Страница 15: ...ks Lowering the lift 1 Press UP button 2 3 seconds to rise the platforms a little height 2 Hold down the lock release lever and the DOWN lever to lower the platforms 2 Drive the car off after the lift...

Страница 16: ...hten oil suction pipe Buffer valve is loose or blocked Tighten or clean buffer valve Slow lowering down occurs after lifting Check if there is oil leakage at any conduit Replace conduit Cylinder is se...

Страница 17: ...ng lowering brackets 6 2 Items to be checked weekly Check flexibility of moving parts Check conditions of safety parts Check volume of hydraulic oil by pressing the lifting button to raise the platfor...

Страница 18: ...King 9XLT Jan 2022 18 Attachments Attachment 1 Packing List of Entire Machine 1 Parking lift Component 1 2 Carton box of power unit Standard part 1 Attachment 2 Winding Pattern of Wire Rope Cylinder...

Страница 19: ...Pro King 9XLT Jan 2022 19 Attachment 3 Hydraulic Schematic Diagram...

Страница 20: ...ramp set 2 2 5 SA4T40L A11 cable 1 8105mm 319 1 2 6 SA4T40L A6 power unit set 1 2 7 SA4T40L A9 oil pipe 1 2170MM 85 4 2 8 MPJ25 00 rolling jack 1 option 2 9 SA4T40 A16 plastic jack tray 4 2 10 SA4T40...

Страница 21: ...Fig 3 ITEM Pro King 9XLT DESCRIPTION QTY NOTE 3 1 SA4T40 A1 B4 top cover of sub column A 2 3 2 SA4T40 A1 B5 top cover of sub column B 1 3 3 SA4T40L A1 B1 sub column 3 A 2 B 1 3 4 SA4T40 A1 B3 main top...

Страница 22: ...12 spacer bush 8 253820 4 6 Threaded pin 12 M6 12 4 7 Philips pan head screw 8 M6 8 4 8 SA4T40 A2 B14 pipe snap clamp 1 4 9 SA4T40 A2 B11 slide block 8 4 10 SA4T40 A2 B8 nylon slide 12 4 11 SA4T40 A2...

Страница 23: ...beam cover 2 right side 4 20 SA4T40 A2 B5 beam shaft 4 4 21 SA4T40 A2 B2 C1 broken rope lock 4 4 22 SA4T40 A2 B6 spacer bush 4 4 23 circlip 8 D25 4 24 SA4T40 A2 B10 nylon slide 2 w right opening 4 25...

Страница 24: ...ter 2 4 50 5 7 SA4T40L A3 B9 C1 cylinder 1 5 8 SA4T40 A2 B19 pulley 6 5 9 SA4T40 A3 B4 spacer bush 4 5 10 SA4T40 A3 B6 wheel shaft 4 5 11 Philips pan head screw 8 M6 12 5 12 SA4T40 A3 B7 fixing plate...

Страница 25: ...CRIPTION QTY NOTE 6 1 Allen screw 2 M6 12 6 2 lock washer 2 D12 6 3 flat washer 2 D12 6 4 bolt 4 M8 25 6 5 lock washer D8 4 D8 6 6 flat washer D8 4 D8 6 7 nut 4 M8 6 8 SA4T40 A6 B1 motor mounting bar...

Страница 26: ...d 2 7 2 SA4T0L A5 B1 T linking rod 1 7 3 SA4T0 A5 B1 C3 spacer sleeve 2 7 4 SA4T0L A5 B1 C4 long linking rod 1 7 5 SA4T0L A5 B1 C1 T linking rod w handle 1 7 6 SA4T0 A5 B1 C6 handle ball 1 7 7 nut 16...

Страница 27: ...8 ITEM Pro King 9XLT DESCRIPTION QTY NOTE 8 1 SA4T0L A14 B1 dolly kit frame 1 8 2 Allen screw 4 M10 35 8 3 flat washer 4 D10 8 4 lock washer 4 D10 8 5 nut 4 M10 8 6 SA4T0 A14 B2 swivel wheel 1 6 8 7 s...

Страница 28: ...XLT Jan 2022 28 Parts Drawing Fig 9 ITEM Pro King 9XLT DESCRIPTION QTY NOTE 9 1 circlip 4 D25 9 2 MPJ25 A1 B3 rolling wheel 4 9 3 MPJ25 A1 B2 pin 4 9 4 Tool case 1 9 5 threaded pin 4 M6 8 9 6 end nut...

Отзывы: