14
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2
FIGURE 13
• Route the swivel end of the CABLE (14) through the holes and around the pulleys in the TOWER BRACE (8) as shown in FIGURE 13.
14
8
STEP 13:
FIGURE 14
STEP 14:
•
Route the CABLE (14) around one 4-1/2” PULLEY (15) and assemble the pulley to the bracket on the LOWER CROSS SUPPORT (4),
using two 3/8 X 2” BOLTS (32), and two 3/8” LOCK NUTS (37) as shown in FIGURE 14.
(NOTE: Make sure CABLE is running over
3/8 X 2” RETAINING BOLT.)
32 3/8 X 2”
15
37
14