Wiring Considerations
22
7.1
Power Wiring
1. Power wiring—rectifier input, bypass input, UPS output and battery cables—must be run in
individual, separate conduits or cable trays. Refer to the Outline and Terminal Details drawings
(
Figures 14
through
19
,
24
,
26
,
28
and
50
through
54
) for locations of the various power
connections within the UPS and ancillary equipment. In particular, note the location of the
rectifier input power connections.
2. Observe local, state and national electrical codes. Verify utility power and its overcurrent
protection rating will accommodate the UPS input rating, including battery recharging.
3. A safety ground wire must be run from the building ground to a ground point in the UPS Module
Cabinets, ancillary equipment and the Power-Tie Cabinet (if applicable). See
6.0 - Configuring
Your Neutral and Ground Connections
. The grounding conductor shall comply with the
following conditions of installation:
a. An insulated grounding conductor must be sized in accordance with the NEC and local codes.
It must be green (with or without one or more yellow stripes) and be installed as part of the
branch circuit that supplies the unit or system.
b. The grounding conductor described above is to be grounded to earth at the service equipment
or, if supplied by a separately derived system, at the supply transformer or motor-generator
set in accordance with the instructions in
6.0 - Configuring Your Neutral and Ground
Connections
.
c. The attachment-plug receptacles in the vicinity of the unit or system are all to be of a
grounding type, and the grounding conductors serving these receptacles are to be connected to
earth ground at the service equipment.
4. Observe clockwise phase rotation of all power wiring. Phase A leads Phase B leads Phase C.
A qualified electrician should check the phase rotation.
5. AC power cables must be rated to meet NEC requirements for voltage drop at the maximum rated
system current. DC power cables from the UPS to the battery terminals and return must be sized
for less than 2 volts total loop drop at the maximum rated system current.
6. If site equipment includes a backup generator and automatic transfer switch(es), consult the
manufacturers of those devices for information on sizing and interfacing to the UPS system.
7. Removable access plates are available for power wiring. Refer to the Outline Drawings for your
particular model (
Figures 14
,
17
,
24
,
26
,
28
and
50
through
54
).
!
CAUTION
Power and control wiring must be separated!
!
CAUTION
After cutting holes in the access plates, be certain that no foreign matter (metal shavings,
sawdust, insulation or wire fragments, etc.) remains inside the UPS. Likewise be certain to
block any “extra” holes in the plates through which foreign matter could later enter the UPS.
Содержание SERIES 610
Страница 6: ...iv...
Страница 42: ...Installation Drawings 36 Figure 17 Outline drawing Multi Module System Standard 88 797606 05 Rev 02...
Страница 43: ...Installation Drawings 37 Figure 18 Terminal details Multi Module System 100 125kVA 88 797606 16 Rev 05...
Страница 44: ...Installation Drawings 38 Figure 19 Terminal details Multi Module System 150 225kVA 88 797606 12 Rev 03...
Страница 45: ...Installation Drawings 39 Figure 20 Battery power pack system 88 797616 03 Rev 08...
Страница 46: ...Installation Drawings 40 Figure 21 Battery power pack Size A 88 797616 01 Rev 10...
Страница 49: ...Installation Drawings 43 Figure 24 Outline drawing System Control Cabinet SCCT 200 1200A 88 797614 01 Rev 08...
Страница 51: ...Installation Drawings 45 Figure 26 Outline drawing System Control Cabinet SCCT 1600 2000A 88 797614 02 Rev 07...
Страница 53: ...Installation Drawings 47 Figure 28 Outline drawing System Control Cabinet SCCT 2500 3000A 88 797614 03 Rev 08...
Страница 57: ...Installation Drawings 51 Figure 32 Control connection location diagram SCCT 96 797619 88A Rev 04...
Страница 79: ...Installation Drawings 73 Figure 54 Outline drawing Remote Status Panel surface mount 88 791617 01 Rev 05...
Страница 80: ...Installation Drawings 74...
Страница 85: ...Site Planning Data Series 610 100 225kVA Multi Module Systems 79 NOTES...
Страница 86: ...Site Planning Data Series 610 100 225kVA Multi Module Systems 80...
Страница 87: ......