![Liebert NX 10kVA Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/liebert/nx-10kva/nx-10kva_installation-manual_1907521014.webp)
Installation
8
1.5.7 Optional Cabinets
If your NX installation includes a Maintenance Bypass Cabinet, the NX must be positioned to allow
the Maintenance Bypass Cabinet to be bolted to
left
side of the NX (see
). Cables from the
Maintenance Bypass Cabinet must be brought through the bottom side of the NX for connection.
The Maintenance Bypass Cabinet must be cabled and bolted to the NX
before
the UPS and bypass
cabinet are moved into their final position. Connect the input wiring to the Maintenance Bypass Cab-
inet ONLY after the units are connected and positioned.
Battery cabinets may be bolted to either side of the NX, unless used in configurations that include a
Maintenance Bypass Cabinet; refer to
Figure 1
Cabinet arrangement
NX connected only to MBC
(MBC must be on left side of the NX)
NX connected to Maintenance Bypass Cabinet and Battery Cabinets
(MBC must be on left side of the NX)
(Battery Cabinets may be on either side of the NX)
Liebert
NX
Maintenance
Bypass
Cabinet
Battery
Cabinet
Battery
Cabinet
Liebert
NX
Maintenance
Bypass
Cabinet
ALL UNITS VIEWED FROM ABOVE
NX connected to Battery Cabinets
(Battery Cabinets may be on either side of the NX)
Liebert
NX
Battery
Cabinet
Battery
Cabinet
Содержание NX 10kVA
Страница 1: ...POWER AVAILABILITY NX INSTALLATION MANUAL 10 30kVA 208V 60Hz...
Страница 54: ...Installation Drawings 48 Figure 27 Location of internal batteries Battery 417mm 687mm 186...
Страница 64: ...Specifications and Technical Data 58 NOTES...
Страница 65: ...Specifications and Technical Data 59...
Страница 66: ...Specifications and Technical Data 60...
Страница 67: ......