 Discharge Line

Make all discharge connections. A check valve is required to 

prevent the backflow of liquid after each pumping cycle. A gate 

valve should follow the check valve to allow periodic cleaning of 

the check valve or removal of the pump. The remainder of the 

discharge line should be as short as possible with a minimum 

number of turns to minimize friction head loss. Do not reduce the 

discharge to below the pump outlet size. Larger pipe sizes may be 

required to eliminate friction head loss over long runs. Contact 

Liberty Pumps or other qualified person if questions arise 

regarding proper pipe size and flow rates.

 Pressure Sewer Applications 

A redundant check valve assembly consisting of a curb stop and 

check valve must be installed between the pump discharge and 

the street main, as close to the public right-of-way as possible, on 

all pressure (force main) sewer installations to protect from system 

pressures. The curb stop valve is necessary to isolate the site from 

the pressure sewer while the check valve provides redundant 

protection against potentially detrimental backflow. All valves and 

fittings should be rated for at least 200 PSI service. See Liberty 

Pumps line of CSV-Series Curb Stop/Swing Check Valve 

Assemblies and CK-Series Connection Kit.

 Vent

The fiberglass basin provided with the system must be completely 

sealed and properly vented per local health and plumbing code 

requirements. If the system is to be vented through the inlet to an 

existing building vent stack, there must be no traps between the 

system inlet and the nearest building vent stack connection 

(option 1). If this is not possible or desirable per the application, a 

standalone vent can be installed in tank side (option 2) or a vent 

flange or grommet can be installed in a hole cut into the cover 

(option 3).

 Guide Rail Systems

If guide rails are used, refer to the separate installations supplied 

with the unit for proper operation.

Opera tion

Energizing the control panel or breaker for the first time is 

potentially dangerous. Licensed electrical personnel should 

be present when the panel or breaker is energized for the first 

time. If faults caused by damage or poor installation practices 

have not been detected, serious damage, injury or death can 

result when power is applied.

Bulkhead 
Connection

Pump Station

Compression 

Adapter 

Fitting

Curb Box

Compression 

Adapter 

Fitting

Valve Extension 
Rod Shown

Curb Stop Valve/Swing 

Check Valve Assembly

To Pump

To Main

Flow

Grade

RISK OF SERIOUS INJURY OR DEATH

 

option 1

option 2

option 3

Discharge

ground level

Sewage line

Содержание LGH02 Series

Страница 1: ...y as possible on all installations to protect from system pressures Installer manual must remain with owner or system operator maintainer Record information from pump nameplate Model Serial Control Pa...

Страница 2: ...wer cord This will damage the power cord and could expose the electrically live wires inside the power cord The electrical power supply shall be located within the length limitations of the pump power...

Страница 3: ...Proper venting of sewer and effluent gases alleviates poisonous gas buildup and reduces the risk of explosion and fire from these flammable gases Wear adequate Personal Protective Equipment when worki...

Страница 4: ...s will be according to the control selected see separate operation instructions supplied with the unit IMPORTANT When connecting an LEP Series pump to an existing control panel verify the panel is cor...

Страница 5: ...higher than the full load input power indicated on the pump nameplate Power and Control Cords Do not remove cord and strain relief and do not connect conduit to pump The power and control cords are fi...

Страница 6: ...that the cutter and impeller are freely spinning rotating the cutter helps to lubricate the shaft seals if the pump has been non operational for more than a week It is recommended to rotate the cutter...

Страница 7: ...200 PSI service See Liberty Pumps line of CSV Series Curb Stop Swing Check Valve Assemblies and CK Series Connection Kit Vent The fiberglass basin provided with the system must be completely sealed an...

Страница 8: ...ive Equipment when working on pumps or piping that have been exposed to wastewater Sump and sewage pumps often handle materials that can transmit illness or disease upon contact with skin and other ti...

Страница 9: ...valve partially closed or clogged Check the discharge line for foreign material including ice if the discharge line passes through or into cold areas Check valve partially clogged Raise liquid level...

Страница 10: ...heck valve Repeated tripping Circuit protection underrated Check rating and replace with proper size Current unbalance Check current draw Other appliance on same circuit Pump requires separate circuit...

Страница 11: ...the discharge line passes through or into cold areas Check valve is stuck closed or installed backward Remove check valve s and examine for freedom of operation and proper installation Gate or ball va...

Страница 12: ...der this Warranty if the product has not been properly installed or maintained in accordance with the printed instructions provided if it has been disassembled modified abused or tampered with if the...

Отзывы: