
Installation Manual
41
ENGLISH
Installation of Indoor Unit
Make sure that all the cables are fed through the cable glands at the top of the unit. In that way
you will ensure the tightness of the device.
In order to ensure water tightness of the cable routing follow the below instructions:
1. Make a small hole in the thin rubber membrane for each cable.
2. Push the cable through making sure the membrane isn’t damaged and that the membrane tightly
wraps the cable.
3. Pull the cable back for approximately 5 mm to make a positive seal.
Make sure only one cable is fed through each cable gland hole to ensure a proper water tightness
seal.
Содержание THERMA V AHNW16606B0
Страница 38: ...38 Air to Water Heat Pump X5 BUS A BUS B GND 10V Installation of Indoor Unit ...
Страница 40: ...40 Air to Water Heat Pump TW TX Ethernet 5 BUS B BUS A GND 10V Installation of Indoor Unit ...
Страница 44: ...44 Air to Water Heat Pump Installation of Indoor Unit Electrical scheme ...
Страница 65: ......