
Installation of Indoor Unit
Installation Manual
21
ENGLISH
Front panel removal
Front panel removal
The connection between the indoor and outdoor unit is performed via refrigerant pipes and
communication line.
The pipeline and electrical cables have to be protected against heat and waterproof insulation in a
protective pipe. This prevents the pipe connections soaking in cases of heavy groundwater or
rainfall and with it intensive draining of heat into its surroundings.
Gas and liquid connection
The pipe connection between the external and internal devices can be made by positioning the
pipes in two ways:
• A inside two separate ribbed protective pipes,
• B in one joint ribbed protective pipe.
Connection with the outdoor unit
Firstly unscrew 2 screws of the panel (A).
Open the panel (A) towards yourself and pull
upward. After this repeat the procedure for each
panel.(B,C)
Содержание THERMA V AHNW16606B0
Страница 38: ...38 Air to Water Heat Pump X5 BUS A BUS B GND 10V Installation of Indoor Unit ...
Страница 40: ...40 Air to Water Heat Pump TW TX Ethernet 5 BUS B BUS A GND 10V Installation of Indoor Unit ...
Страница 44: ...44 Air to Water Heat Pump Installation of Indoor Unit Electrical scheme ...
Страница 65: ......