- 16 -
1. Application Object
This instruction is for the application to the TV MB-02JB
chassis of DLP Projection.
2. Notes
1) The power source insulation of this DLP Projection is not
charging type and you may not use the transformer for
insulation. But you’d better adjust the set after operating it
with insulation transformer between power supply cable
and input part of the set for protecting the adjusting
equipments.
2) The adjustment must be performed under the correct
sequence.
3) The adjustment must be performed in the circumstance of
25
¡
5°C of temperature and 65
!
10% of relative humidity if
there is no specific designation.
4) The input voltage of the receiver must keep 230V, 50Hz in
adjusting.
5) The set must be operated for 5 minutes preliminarily before
adjustment if there is no specific designation.
The preliminary operation must be performed after
receiving 100% white pattern,but reception of the moving
picture may also be possible in unavoidable case.
3. Composition of Adjustment Mode
1) All adjustment mode are entered by pressing the ADJ key
on the remore control,after adjustment pess the ADJ key to
come out.
2) Below picture is screen composition when press the first
ADJ key.
3) When press the ADJ key and entered EZ Adjust
Mode,picture appear above screen. Select menu to adjust
with using (CH+(
D
),CH-(
E
)) key above screen and press
the enter key to adjust on the wanting menu.
4) Adjust the value of adjustment with using the volume
+(
F
),volume -(
G
) key.
5) Press the ADJ key to come out after adjustment.
4. CPLD Memory work
(1)Required Test Equipments & Preparation for
Adjustment
1) Connect the PC and memory JIG as shown figure.
2) Turn on JIG MAIN POWER SW.
3) After turn on the PC and moniter, operate the device
programming.
(2) Adjustment Sequence
1) After program running, displayed [OPTION MODE
SELECTION] window.
Check the “Load configuration File(.cdf, .pdr)” in this
window and click the finish button
2) When the screen displays the open window, select the
suitable file(*.cdf) according to model.
3) IC figure is change to green by clicking it.
4) Select the program of operations.
5) Check the Erase before programming and Verify menu
as shiwn below and press the OK button.
6) At this time, the download starts. The download finished
after 10 seconds.
ADJUSTMENT INSTRUCTIONS
<Fig.How to connect the MEMORY JIG and PC>
Содержание RE-44SZ21RD
Страница 22: ... 22 MAIN TOP PRINTED CIRCUIT BOARD ...
Страница 23: ... 23 MAIN BOTTOM ...
Страница 24: ... 24 TUNER TOP TUNER BOTTOM ...
Страница 25: ... 25 DLP DRIVER B D TOP DLP DRIVER B D BOTTOM ...
Страница 26: ... 26 DIGITAL BOARD TOP DIGITAL BOTTOM ...
Страница 27: ... 27 POWER ...
Страница 28: ... 28 POWER LED TOP SMPS BOTTOM SMPS TOP POWER LED BOTTOM PRE AMP TOP PREAMP BOTTOM ...
Страница 29: ... 29 COMPONENT TOP COMPONENT BOTTOM CONTROL TOP CONTROL BOTTOM ...
Страница 41: ...P No 3854VA0114E S1 1 2 2003 05 06 ...
Страница 42: ...P No 3854VA0114E S1 2 2 2003 05 06 ...
Страница 43: ...P No 3854VA0114E S2 1 2 2003 05 06 ...
Страница 44: ...P No 3854VA0114E S2 2 2 2003 05 06 ...
Страница 45: ...SVC SHEET 3854VA0114E S1 SVC SHEET 3854VA0114E S2 ...
Страница 46: ...rvice com hsup html ...