10
LG MultiSITE
TM
E10 Controller
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
INSTALLATION
Wiring terminal positions are shown below, along with LED locations.
UNIVERSAL INPUTS
1
U
V
0
U2
U3
U4
U5
0V
0V
ANALOG OUTPUT
RS485
0V
0V
AO2
AO1
S
A
+
A
-
24 VAC/DC
GND
FACTORY
RESET
DEBUG
DIGITAL OUTPUTS
A
B
B
A
B
A
D3
D2
D1
SEC
PRI
1
2
3
4
6
5
7
8
Connector Locations
Field connections are shown below:
Item
Description
1
Universal inputs. Five inputs on 8-position connector.
2
Analog outputs. Two outputs on 4-position connector.
3
RS485 port. One port on 3-position connector.
4
Digital (triac) outputs. Three non-powered outputs on 6-position connector.
5
24 Vac/dc input. One input on 2-position connector.
6
Earth ground. One tab for earth ground.
7
Ethernet ports. Two 10/100Mb, RJ-45 connectors with integrated LEDs.
8
DEBUG port for serial debug communication.
Wiring
Refer to “Connector Locations” and the following images to locate connectors and other components. Descriptions
are provided for wiring to ground, to power, RS-485, Ethernet, Inputs and Ouputs.
Wiring Earth Ground & Power
24 VAC/DC
GND
FACTORY
RESET
DEBUG
SEC
PRI
24 Vac
50/60Hz
24 Vdc
+
4
2
DC
AC
1
3
5
NOTE: Because the MS-E10 Controller uses a half-wave rectified power supply, it should not share a
transformer with the JACE-8000, IO-R-34, or any legacy JACE.
NOTE: Use earth grounding to provide protection from electrostatic discharge or other forms of EMI.
NOTE: Pay attention to the following, depending on the type of power source that you use:
AC:
Dedicated 24V transformer required, with neither side of the transformer secondary tied to ground.
DC:
Polarity is critical to protect diode (uses onboard half wave rectified power supply). Connect - to ground and + to the
other terminal.
WARNING
Before making power terminations, de-energize the 24V power source.
Do not restore power until completing all other mounting and wiring. See “Power up and Initial Checkout”.