7
2
TIPS FOR SAVING EN-
ERGY
3
IMPORTANT SAFETY IN-
STRUCTIONS
8
INSTALLATION
PROCESS
9
OUTDOOR UNITS IN-
FORMATION
10
ENVIRONMENT-
FRIENDLY ALTERNATIVE
REFRIGERANT R410A
11
SELECT THE BEST LO-
CATION
12
INSTALLATION SPACE
16
Collective / Continuous Installation for
roof top use
17
Air guide work
18
LIFTING METHOD
19
INSTALLATION
19
The location of the Anchor bolts
20
Foundation for Installation
21
Preparation of Piping
24
Plumbing materials and storage meth-
ods
26
REFRIGERANT PIPING
INSTALLATION
26
Precautions on Pipe connection / Valve
operation
27
PIPE CONNECTIONS BE-
TWEEN INDOOR AND
OUTDOOR UNIT
27
Preparation Work
29
Pipe Drawing Out
30
Selection of Refrigerant Piping
31
Refrigerant piping system
38
Refrigerant charging
39
Distribution Method
40
Branch pipe Fitting
44
Leak Test and Vacuum drying
46
Heat insulation of refrigerant piping
47
ELECTRICAL WIRING
47
Caution
49
Control box and connecting position of
wiring
50
Communication and Power Cables
51
Wiring of main power supply and
equipment capacity
52
Field Wiring
55
Checking the setting of outdoor units
56
Automatic Addressing
59
Saving power consumption
59
Night Low Noise Function
60
Forced Cooling Operation
61
Vaccum mode
62
Target pressure adjusting
63
Self-Diagnosis Function
66
CAUTION FOR REFRIG-
ERANT LEAK
66
Introduction
66
Checking procedure of limiting concen-
tration
68
INSTALLATION GUIDE
AT THE SEASIDE
TABLE OF CONTENTS
TABLE OF CONTENTS
ENGLISH
1,MFL67798026,영영 19. 3. 14. 영영 4:48 Page 7
Содержание MULTI V S ARUV025GSR0
Страница 70: ...70 ENGLISH 1 MFL67798026 영영 19 3 14 영영 4 49 Page 70 ...
Страница 71: ...1 MFL67798026 영영 19 3 14 영영 4 48 Page 100 ...