Figure 20: Typical Multi V S Three-Phase Heat Pump System Building
Layout Listing the Piping Limitations — When the Outdoor Unit is Above
the Indoor Units.
Figure 21: Typical Multi V S Three-Phase Heat Pump System Building
Layout Listing the Piping Limitations — When the Outdoor Unit is Below
the Indoor Units.
Elevation Differential ODU to IDU: 164'
Elevation Differential IDU to IDU: 49'
Longest pipe length after first branch: 131'
Longest pipe length: 492' actual (574' equiv
.)
Max. Total Equivalent Piping Length: 984'
Elevation Differential ODU to IDU: 131'
Elevation Differential IDU to IDU: 49'
Longest pipe length after
first branch: 131'
Longest pipe length: 492' actual (574' equiv
.)
Max. Total Equivalent Piping Length: 984'
Table 9: Piping Limitations for Multi V S Three-Phase Heat Pump Operation (See next page).
PIPING LIMITATIONS
The following pages present Multi V S Three-Phase piping limitations and are for illustrative purposes only. Designers MUST use LATS when designing LG VRF systems.
1
Assume equivalent pipe length of Y-branch is 1.6 feet, and equivalent pipe length of header is 3.3 feet.
Length
Total pipe length
Longest actual pipe length
Equivalent pipe length1
$Ȉ%Ȉ&IHHW
IHHW
IHHW
Ɛ
Longest pipe length after first branch
IHHW
Elevation1
(OHYDWLRQGLIIHUHQWLDO2XWGRRUXQLWļ,QGRRUXQLW
When the Outdoor unit is Positioned Higher than the Indoor Units
When the Outdoor unit is Positioned Lower than the Indoor Units
IHHW
IHHW
Elevation2
(OHYDWLRQGLIIHUHQWLDO,QGRRUXQLWļ,QGRRUXQLW
IHHW
'LVWDQFHEHWZHHQ¿WWLQJVDQGLQGRRUXQLWV
LQFKHV
'LVWDQFHEHWZHHQ¿WWLQJVDQG<%HDGHUV
LQFKHV
Distance between two Y-Branches / Headers
LQFKHV