- 9 -
ADJUSTMENT INSTRUCTIONS
(1) Click on ‘Key Generation (G)’.
(2) Input the number of the key in Generation count.
ex) If 100 Keys are required, then just register 100 and
next time it will automatically get 101.
(3) Input file : When installing the program for the first time,
(4) Click on ‘Generation’ ———————————————(1)
If it is done correctly, you will see “Job is Success.”——(2)
Click on ‘close’——————————————————(3)
(5) Check the Generation Data(Confirmation it’s possible
(6) It is possible to check how many Generations are created
4-3. HDCP Download Method
(1) Input power of Stand-By 5V.
(Download must be executed only when it is on Stand-by)
(2) The RS-232C(9PIN) must be connected to the COM1 on
the PC.
(3) If all the preparation is completed, click on ‘Download’.
(4) If abnormal state (Fig. 8) display then (3) execute.
(Fig. 5)
(Fig. 8) Abnormal State
Содержание MU-50PM10
Страница 24: ... 24 BLOCK DIAGRAM h t t p w w w w j e l n e t ...
Страница 25: ... 25 NOTES h t t p w w w w j e l n e t ...
Страница 35: ...h t t p w w w w j e l n e t ...
Страница 36: ...h t t p w w w w j e l n e t ...
Страница 37: ...h t t p w w w w j e l n e t ...
Страница 38: ...h t t p w w w w j e l n e t ...
Страница 39: ...h t t p w w w w j e l n e t ...