INSTALLATION
9
EN
G
LIS
H
Select the best Location
- There should not be any heat or steam near
the unit.
- Select a place where there are no obstacles
around of the unit.
- Make sure that condensation drainage can
be conveniently routed away.
- Do not install near a doorway.
- Ensure that the interval between a wall and
the left (or right) of the unit is more than
100mm. The unit should be installed as high
as possible on the wall, allowing a minimum
of 200mm from ceiling.
- Use a metal detector to locate studs to pre-
vent unnecessary damage to the wall.
* The feature can be changed according to
type of model.
Fixing Installation Plate
The wall you select should be strong and solid
enough to prevent vibration
1
Mount the installation plate on the wall
with type "A" screws. If mounting the unit
on a concrete wall, use anchor bolts.
- Mount the installation plate horizontally
by aligning the centerline using Horizontal
meter .
2
Measure the wall and mark the centerline.
It is also important to use caution concern-
ing the location of the installation plate.
Routing of the wiring to power outlets is
through the walls typically. Drilling the hole
through the wall for piping connections
must be done safely.
More than 200
More than
100
More than 2300
More than
100
(Unit : mm)
CAUTION
Install the indoor unit on the wall where
the height from the floor is more than
2300mm.
!
Installation Plate
Chassis
Hook
Type "A" Screws
Ø65
133
95
Ri
gh
t r
ea
r p
ip
in
g
Le
ft
re
ar
p
ip
in
g
Installation Plate
Place a level on raised tab
Unit Outline
217
175
(Unit : mm)
442
442
Ø65
Ø65
Ø65
INSTALLATION
Содержание MS09AQ
Страница 17: ......