5-10
COMPONENTS
TEST PROCEDURE
RESULTS
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
Relay 1
Relay 2
A(RD) B(BK)
C(WH)
Measure the resistance.
(Ohm-meter scale: R x 1000)
Normal:
A~B : Approx. 65 ~ 80 ohm
B~C : Approx. 10 ~ 30 ohm
A~C : Approx. 85 ~ 105 ohm
Abnormal: Infinite or several
ohm.
Normal: Approx. 100 ~ 150 ohm
Abnormal: Infinite or several
ohm.
Measure the resistance.
(Ohm-meter scale: R x 100)
OFF
Cooking Start
Содержание MS-1146SQP
Страница 9: ...SCHEMATIC DIAGRAM 4 3 ...
Страница 27: ... 6 2 DOOR PARTS 14026A 14970A 13581A 13536A 13552A 13213A 13720D 14890A EV ...
Страница 28: ... 6 3 CONTROLLER PARTS 24970A 250201 23572A 268711 24781M 24510L 23506A EV ...
Страница 29: ... 6 4 OVEN CAVITY PARTS 33390G 35889A 33112U 36549S 33052A EV ...
Страница 30: ... 6 5 LATCH BOARD PARTS 43501A 43500A 466001 466003 466001 WSZ085 EV ...
Страница 32: ... 6 7 BASE PLATE PARTS 63303A 56170D WSZ002 EV ...
Страница 33: ......