3. Evacuation
(All amount of refrigerant leaked)
• Procedure
(1) Connect the vacuum pump to the charge set’s
center hose
(2) Evacuation for approximately one hour.
– Confirm that the gauge needle has moved
toward -76 cmHg (vacuum of 4 mmHg or
less).
(3) Close the valve (Lo side) on the charge set,
turn off the vacuum pump, and confirm that
the gauge needle does not move (approxima-
tely 5 minutes after turning off the vacuum
pump).
(4) Disconnect the charge hose from the vacuum
pump.
– Vacuum pump oil.
If the vacuum pump oil becomes dirty or
depleted, replenish as needed.
Lo
Open
Open
Vacuum pump
2-Way
valve
Outdoor unit
Liquid side
Indoor unit
Gas side
3-Way
valve
CLOSE
OPEN
-48-
Содержание LS-J0762YL
Страница 66: ...Schematic Diagram 66 Indoor _YL _UL Series ...
Страница 67: ... 67 Indoor _NM _NN Series ...
Страница 68: ... 68 Outdoor 7K AC Series ...
Страница 69: ... 69 Outdoor 12K AC Series ...
Страница 70: ... 70 Outdoor 9K DC Series ...
Страница 71: ... 71 Outdoor 12K DC Series ...
Страница 78: ...Memo 78 ...
Страница 79: ...P No 3828A20177G December 2004 Printed in Korea ...