7-12
TEST THE LATCH AND SWITCH SEQUENCE
(5) Open the oven door slowly. Watch the door latch,
the Primary Switch. Release Rod and Lever on the
switches to make sure they are zero to the body of
the switches in the following sequence:
- Primary Interlock Switch
- Secondary Interlock Switch
- Interlock Monitor Switch
Adjust the latch board until the switches operate in
this sequence. See Steps 3 and 4.
(6) Close the oven door slowly and be sure it is tightly
closed. Watch the three switches to make sure
they are zero to the body of the switches in the
following sequence:
- Interlock Monitor Switch
- Primary Interlock Switch
- Secondary Interlock Switch
NOTE: The Interlock Monitor Switch is an added
safety check on the Primary and
Secondary Interlock Switches. If the
Primary and Secondary Interlock Switches
allow the oven to operate with the door
open, the Monitor Switch will blow the
fuse.
(7) When you achieve the proper sequence of
switches in Steps 5 and 6, tighten the latch board
screws at that point.
TEST THE MICROWAVE ENERGY LEAKAGE
Make sure the microwave energy leakage is below the
limit of 1mW/cm
2
(with a 275 ml water load) and
5mW/cm
2
(with a 275 ml water load without the
cabinet) when measured with a survey meter.
Содержание LMVM1945SB
Страница 9: ...5 1 SCHEMATIC DIAGRAM OVERALL CIRCUIT DIAGRAM ...
Страница 10: ...5 2 MATRIX CIRCUIT FOR TOUCH KEY BOARD ...
Страница 37: ...8 2 CONTROLLER PARTS I 23506A 268711 ...
Страница 38: ...8 3 CONTROLLER PARTS II 268712 WTT028 250201 23572A 24810P 24781M ...
Страница 40: ...8 5 LATCH BOARD PARTS 43500A WSZ085 43501A 466001 466003 466001 44510A ...
Страница 43: ...8 8 INSTALLATION PARTS 44360A WSZ133 WWZ068 WSZ204 WSZ203 WSZ136 WSZ098 WWZ068 63300M 65862D 65862B 63861A ...
Страница 44: ...8 17 SCHEMATIC DIAGRAM OF P C B ...
Страница 45: ...8 18 PRINTED CIRCUIT BOARD ...
Страница 46: ...P NO 3828W5S3133 June 2003 Printed in Korea ...