02 Installation Instructions
2.1 Unacceptable Installations
Please avoid the following installations which will damage the system or the Inverter.
The following installations should be avoided. Any damage caused will not be covered by the warranty
policy.
For the general version, backup cannot connect in parallel.
For advanced applications, please contact our Tech Support
Dept
Single PV string cannot connect to multiple inverters.
One meter cannot be connected to multiple inverters.
Different CTs cannot connect to the same line cable.
The On-Grid or back-up side cannot be
connected to any AC generator directly.
The inverter battery input must not be
connected to incompatible batteries.
The backup side cannot be connected
to the grid.
One battery bank cannot be connected to multiple inverters.
2.2 Packing List
Upon receiving the hybrid inverter, please check if any of the components as shown below are
missing or broken.
PE
Terminal
Expansion
Bolts
Fixed
Screw
Positive PV Plug
or
Battery Cover
or
Negative PV Plug
Inverter
Documentations
Smart Meter With CT
Wall-Mounted
Bracket
Reset
SMART METER
US
B
Battery
Terminal
Pin
Terminal
Hexagon
screw
WiFi
Module
Bluetooth
Module
Clip