52 Multi type Air Conditioner
Installation
BD Unit
■
Installation of BD unit
• This unit may be installed suspended from the ceiling or mounted on the wall.
• This unit may only be installed horizontally , as shown in the diagram below.(Side B is facing up)
However, it may be freely installed in any direction forward or back, and to the sides.
• Be sure to leave a 600mm square opening for service and inspection as shown in the diagram below, for both
ceiling - suspended installation and wall-mounted installation.
• This unit "does not require drain treatment" as it uses internal foam treatment as low-pressure piping insulation.
• Service direction is the side B and C
• The piping for the indoor unit may be led around in direction A
• The inclination of side B must be within ±5°C degrees forward or back or to the sides.
(298)
250
Ø9.52 flare
Ø6.35 flare
Main Pipe
Ø12.7 flare
Ø19.05 flare
Cover Control
Branch Pipe
Suspension bolt pitch.
245
(337)
50
50
50
50
50
50
(56)
50
(38)
(36)
50
30
(111)
Min 400
Min 30
Min 400
40
50
300
45
(150)
Inspection opening
(Servicing space)
Min 300
A
B
C
Содержание L8UC100BFA0
Страница 92: ...92 Multi type Air Conditioner Schematic Diagram 2 Outdoor Unit 1 L8UC100BFA0 L8UH100BFA0 ...
Страница 95: ...Service Manual 95 L8UH100BFA0 L8UC100BFA0 Schematic Diagram 2 Outdoor Unit ...
Страница 97: ...Service Manual 97 2 Duct Type High static BH BG BE chassis Schematic Diagram ...
Страница 98: ...98 Multi type Air Conditioner Schematic Diagram Low static BT BT1 chassis ...
Страница 99: ...Service Manual 99 4 way TE TF TD chasis 58 B Schematic Diagram ...
Страница 100: ...100 Multi type Air Conditioner Schematic Diagram 2 Display ASSEMBLY 1 Split Type ...
Страница 153: ...P No 3828A22009L October 2005 Printed in Korea ...