12
ENGLISH
INSTALLA
TION OF DECORA
TIVE PANEL(
ACCESSORY
)
6
Open two screws of control panel cover.
Screw
7
Connect one display connector and two
vane control connectors of front panel to
indoor unit PCB.
The position marking on PCB is as:
Display connector : CN-DISPLAY
9
Install the air inlet grille and Filter on the
Vane control connector: CN-V
ANE 1,2
8
Close the cover for control box.
panel.
CN
-VA
NE 1
,2
CN
-D
IS
PLA
Y
Air conditioner
unit
Decorative panel
Fit the insulator (this part) and
be careful
for cool air leakage
Good example
Ceiling
board
Ceiling
board
Decorative
panel
Air
Cool air leakage
(no good)
Bad example
Air conditioner unit
CA
UTION
Install certainly the decorative panel.
Cool air leakage causes sweating.
Water drops fall.
!
Содержание JTNQ36GNLE5
Страница 1: ...ROOM AIR CONDITIONER OWNER S MANUAL 4 WAY CEILING CASSETTE P No MFL67850901_v3 MFL67850901 ...
Страница 29: ......