14
Room Air Conditioner
6. Shroud
1. Remove the fan. (Refer to section 5)
2. Remove the shroud. (See Figure 20)
3. Re-install the components by referring to the
removal procedure, above.
7. Overload Protector
1. Remove the cabinet. (Refer to section 2)
2. Remove the nut that fastens the terminal cover.
3. Remove the terminal cover. (See Figure 21)
4. Remove all the leads from the overload protec-
tor.
5. Remove the overload protector.
6. Re-install the components by referring to the
removal procedure, above.
8. Compressor
1. Remove the cabinet. (Refer to section 2)
2. Discharge the refrigerant system using a
Freon
TM
Recovery System.
If there is no valve to attach the recovery sys-
tem, install one (such as a WATCO A-1) before
venting the Freon
TM
. Leave the valve in place
after servicing the system.
3. Remove the overload protector. (Refer to sec-
tion 7)
4. After purging the unit completely, unbraze the
suction and discharge tubes at the compressor
connections.
5. Remove the 3 nuts and the 3 washers which
fasten the compressor.
6. Remove the compressor. (See Figure 22)
7. Re-install the components by referring to the
removal procedure, above.
Disassembly
Electrical Parts
Figure 20
Figure 21
Figure 22
Содержание HBLG2504E
Страница 37: ...Service Manual 37 Memo ...
Страница 38: ...38 Room Air Conditioner Memo ...
Страница 39: ...P No 3828A20306J Printed in Korea ...