Major repair method for freezing cycle
- 39 -
Connecting the pipe
Connect the red hose to the high pressure side and the blue
hose to the low pressure side.
Vacuuming order
Open valve 1 and 2 to vacuum for 40 minutes and then
close valve 1.
Working order
1) After completing the vacuuming, check the refrigerant
amount for each model.
2) Using the vacuum pump, make the bombe vacuum.
3) Measure the refrigerant charging amount
- Using an electric weight, measure the weight of the
vacuum bombe.
- After charging the refrigerant in the bombe, calculate and
measure the weight.
4. Vacuuming
5. Refrigerant charging
Item
Caution
3
1
2
3-Way
Valve
Condenser
Hot Line Pipe
Vacuum
pump
Evaporator
Compressor
Drier
High pressure
side
Low
pressure
High
pressure
Blue
Yellow
Red
Indicates the weight of
empty bombe
- Room temperature
must be around 25°C
during the operation.
- Control the refrigerant
charging amount as
follow; -5g in winter and
+5g in summer.
Key Point
Refrigerant amount=Weight after charging -
Weight before charging (Bombe weight)
Calculation of refrigerant charging amount
- When vacuuming,
connect the power to
increase the vacuum
effect.
- When sucking the
refrigerant operate the
compressor. (Inserting
refrigerant is easier
and surer.)
Key Point
Содержание GR-K192UF
Страница 8: ...Chapter 4 Circuit diagram Circuit diagram 8 ...
Страница 29: ...MICOM function and circuit description 29 ...
Страница 54: ...Assembly diagram and service parts list 54 249G 249D 248A 249B 212D 102A 102A 248D 147C 147A 270A 212G ...
Страница 55: ...P No MFL31842103 FEB 2008 Printed in Korea ...