-
4
-
▼
G eneral C ontrol of R efrigerating C ycle
1
(1)H 30
•
C hemical Ingredients
Ag : 30%, C u : 27%, Zn : 23%, C d : 20%
B razing Temperature : 710~840°C
(2)B cup-2
•
C hemical Ingredients
C u : About 93%
P : 6.8~7.5%
The rest : within 0.2%
•
B razing Temperature : 735~840°C
•
R ecommend H34 containing 34% Ag in
the S ervice C enter.
WE LDING R OD
2
•
Ingredients and how to make
B orax 30%
B orax 35%
F luoridation kalium : 35%
Water : 4%
Mix the above ingredients and boil until they
are transformed into liquid.
•
Make amount for only day.
Holding period : 1 day
•
C lose the cover of container to prevent
dust putting in the F LUX.
•
K eep it in a stainless steel container.
F LUX
3
(1)B oth of the tube is inserted up to the stop.
(2)B oth of the LOK R ING is pushed up to the stop
(3)The bending point is not too close to the joint
ending.
(4)During the assembly it is important that both
ends remain completely within the joint.
•
F or a hermetically sealed metal/metal
connection, the tube ends have to be
clean.
•
LOK P R E P is distributed all of out-surface
of the tube ends.
LOK R ING
(F igure 23, 24)
4
(1)Assemble the drier within 30min.
after unpacking.
(2)K eep the unpacked drier at the temperature of
80~100°C .
•
Don't keep the drier in a outdoors because
humidity damages to it.
DR IE R AS M
6
(1)The pressure of dry air must be more han
12~16kg/cm
2
(2)Temperature must be more than -20~-70°C .
(3)K eep the pressure at 12~6kg/cm
2
also when
substituting dry air for Nitrogen G as.
DR Y AND AIR
NITR OG E N
G AS
7
(1)C heck if gas leaks with soapy water.
(2)R eplace Quick C oupler in case of leakage.
•
C heck if gas leaks from joint of the
C oupler.
NIP P LE AND
C OUP LE R
5
(1)When measuring with pirant Vacuum gauge
the charging M/C , vacuum degree is within 1
Torr.
(2)If the vacuum degree of the cycle inside is 10
Torr. below for low pressure and 20 Torr. for
high pressure, it says no vacuum leakage
state.
(3)Vacuum degree of vacuum pump must be,
0.05 Torr. below after 5 min.
(4)Vacuum degree must be same to the value
described item above for more than 20 min.
•
Apply M/C Vacuum G auge without fail.
•
P erform vacuum operation until a proper
vacuum degree is built up.
•
If a proper vacuum degree isn't built up,
check the leakage from the C ycle P ipe line
part and Quick C oupler C onnecting part.
VAC UUM
8
•
P ut all J oint P ipes in a clean box and cover
tightly with the lid so that dust or humidity is
not inserted.
P IP E
NO.
ITE MS
C ONTE NTS AND S P E C IF IC ATIONS
R E MAR K S
TR OUB L E S HOOTING (Mechanical P art)
Содержание GBB530***F Series
Страница 35: ... 35 CIR CUIT DIAGR AM A ...
Страница 36: ... 36 CIR CUIT DIAGR AM Linear A ...
Страница 37: ... 37 CIR CUIT DIAGR AM Linear A FLB compressor ...
Страница 39: ...CIR CUIT DIAGR AM 39 A A ...
Страница 40: ...CIR CUIT DIAGR AM 40 A HIT Model MEZ64799002 ...
Страница 41: ...CIR CUIT DIAGR AM 41 A BMG ...
Страница 42: ...CIR CUIT DIAGR AM 4 A BMG ...
Страница 43: ...CIR CUIT DIAGR AM 4 A FMA ...
Страница 50: ... Figure 24 LOKRING TOOL Figure 23 LOKRING TR OUB LE S HOOTING Mechanical Part ...
Страница 64: ... 6 2 Dis play PCB P No E B R 7 6 4 5 6 7 Picture PCB Picture ACQ838523 EBR364958 ...
Страница 92: ...P No M FEB 2015 Printed in Poland ...