![LG EVESPBO0100A0 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/lg/evespbo0100a0/evespbo0100a0_product-manual_206721020.webp)
3. Installation
3.1.8 System clearance(TBD)
Battery requires adequate clearance for installation, cabling, and airflow.
Minimum clearance in the system configuration is as follows.
3.1.9 Installing the Battery Pack
Caution
Make sure that the inverter AC and DC disconnects are turned
off before connecting the power cable to the battery pack.
Содержание EVESPBO0100A0
Страница 1: ...9 8kWh Battery Pack Product Manual HV ...