3. Installation
3.1 Mechanical requirements
3.1.1 Packaging and Open out equipment (TBD)
1. Lift the cover upwards to remove it.
2. Pull out other items. Take them out and
check if any item is missing. See Package
items on section 3.1.2
4. Remove the side cover.
5. Pull out the battery pack using
handles and stand it up.
1.
2.
3.
5.
4.
3. Remove the wall bracket guide pad &
cushioning pad.
Содержание EVESPBO0100A0
Страница 1: ...9 8kWh Battery Pack Product Manual HV ...