12
INSTALLATION INSTRUCTIONS
Preview Installation Order
Checking and
choosing the proper
location
Leveling the dryer
Connecting electric
dryers
Venting the dryer
Plugging in the
power cord and
grounding
Connecting gas
dryers
Test run
Installation test
(Refer to page 33.)
Press and hold
120V~
240V~
Connecting the inlet hose
INSTALLATION INSTRUCTIONS
Содержание DT22BSSG
Страница 52: ...51 ENGLISH ...
Страница 53: ...52 ...
Страница 54: ...53 ENGLISH ...
Страница 55: ...54 ...
Страница 106: ...51 ESPAÑOL ...
Страница 107: ...52 ...
Страница 108: ......
Страница 109: ......