23
INSTALLATION
ENGLISH
Four-Wire Direct Wire
•
A 4-wire connection is required for
all mobile and manufactured home
installations, as well as all new
construction after January 1, 1996.
•
A UL-listed strain relief is required.
•
Use UL-listed 4-wire #10 AWG-
minimum copper conductor cable.
Allow at least 5 ft. (1.5 m) of wire to
allow for removal and reinstallation of
the dryer.
1
Remove 5-inch (12.7 cm) of the outer covering
from the wire. Remove 5-inch of insulation from
the ground wire. Cut off approximately 1.5-inch
(3.8 cm) from the other three wires and strip 1
inch (2.5 cm) insulation from each wire. Bend
the ends of the three shorter wires into a hook
shape.
1" (2.5 cm)
Ground Wire
5" (12.7 cm)
2
Remove the terminal block access cover on the
upper back of the dryer.
3
Install a UL-listed strain relief into the power
cord through-hole.
4
Thread the 4-wire #10 AWG-minimum copper
power cable prepared in step 1 through the
strain relief.
Terminal Block
UL-Listed Strain Relief
UL-Listed 4-Wire Power
Cord
5
Transfer the dryer’s ground wire from behind the
green ground screw to the center screw of the
terminal block.
6
Attach the two hot leads of the power cord to the
outer terminal block screws.
7
Attach the white neutral wire to the center screw
of the terminal block.
8
Attach the power cord ground wire to the green
ground screw.
9
Tighten all screws securely.
10
Reinstall the terminal block access cover.
Hot (Black)
Ground Screw
Power Cord Ground
Wire
White Wire moved from
Ground Screw
Hot (Red)
Neutral (White)
Three-Wire Power Cord
•
A 3-wire connection is NOT permitted
on new construction after January 1,
1996.
•
A UL-listed strain relief is required.
•
Use a 30-amp, 240-volt, 3-wire,
UL-listed power cord with #10 AWG-
minimum copper conductor and closed
loop or forked terminals with upturned
ends.
1
Remove the terminal block access cover on the
upper back of the dryer.
2
Install a UL-listed strain relief into the power
cord through-hole.
3
Thread a 30-amp, 240-volt, 3-wire, UL-listed
power cord with #10 AWG-minimum copper
conductor through the strain relief.
Terminal Block
UL-Listed Strain Relief
UL-Listed 3-Wire Power
Cord
4
Attach the two hot leads (black and red) of the
power cord to the outer terminal block screws.
5
Attach the neutral (white) wire to the center
terminal block screw.
6
Connect the external ground (if required by local
codes) to the green ground screw.
7
Tighten all screws securely.
8
Reinstall the terminal block access cover.
Hot (Black)
Ground Screw
White Wire from Dryer
harness
External Ground Wire (If
required by local codes)
Hot (Red)
Neutral (White)
Содержание Dle1501 series
Страница 46: ...46 MEMO ...