Getting Started
12
Getting Star
ted
1
Additional components for installation
Applied to
Additional Components
Wall mounting
y
Stainless steel screws with diameter 6 mm - 8mm
y
Anchors
PV connections
y
MC4 connectors
y
Lead wires with the cross-sectional area 2.5 mm
2
- 6 mm
2
Battery Connections
y
Lead wires with the cross-sectional area 2.5 mm
2
- 4 mm
2
Grid connections
y
Lead wires with the cross-sectional area 2.5 mm
2
- 6 mm
2
(including yellow green stripe cable)
Energy meter and
internet connections
y
LAN cable
y
RJ-45 plug
y
Energy meter cable
Grounding
y
LAN cable
y
RJ-45 plug
y
Energy meter cable
Содержание D005KD1N111
Страница 84: ......
Страница 97: ...End user 2 4 1 1 1 3 13 3 8 Accept terms Owner checks Select All and select AGREE ...
Страница 113: ...Appendix Installer 29 3 9 f Select OK button Installer can check that another installer has been registered like below ...
Страница 115: ...Appendix Installer 31 5 9 Installer terms New installer must select the 2 boxes I agree and the button Submit ...
Страница 119: ...Appendix Installer 35 9 9 f Click Company Information Installer can check that a subsidiary has been registered f ...
Страница 120: ......
Страница 204: ......
Страница 217: ...Endverbraucher 2 4 1 1 1 3 13 3 8 Annahme der Geschäftsbedingungen Der Kunde wählt Alle auswählen und ZUSTIMMEN ...
Страница 240: ......
Страница 324: ......
Страница 360: ......
Страница 444: ......
Страница 457: ...Eindgebruiker 2 4 1 1 1 3 13 3 8 Voorwaarden accepteren De eigenaar schakelt Alles selecteren in en kiest ACCEPTEREN ...
Страница 480: ......