20
ENGLISH
2-Core Shield Cable
Multi-Core Cable
Remote
control
Remote
control
Remote
control
Remote
control
Indoor
Unit
Outdoor Unit
Outdoor Unit
Indoor
Unit
Indoor
Unit
Indoor
Unit
Outdoor Unit
Outdoor Unit
Remote
control
Remote
control
Indoor
Unit
Indoor
Unit
Remote
control
Remote
control
Indoor
Unit
Indoor
Unit
Master
Slave1
Slave2
Remote
controller
Remote
controller
Indoor
Unit
Indoor
Unit
Remote
controller
Outdoor Unit
Outdoor Unit
Remote
controller
Indoor
Unit
Indoor
Unit
Master
Slave1
Slave2
Master
Slave1
Slave2
Outdoor Unit
Remote
controller
Remote
controller
Indoor
Unit
Indoor
Unit
Remote
controller
Remote
controller
Indoor
Unit
Indoor
Unit
Master
Slave1
Slave2
Outdoor Unit
2-Core Shield Cable
Multi-Core Cable
CAUTION
When the 400 volt power supply is applied to “N” phase by mistake,
check damaged parts in control box and replace them.
Precautions when laying power wiring
Use round pressure terminals for connections to the power terminal
block.
Round pressure terminal
Power cable
When none are available, follow the instructions below.
- Do not connect wiring of different thicknesses to the power terminal
block. (Slack in the power wiring may cause abnormal heat.)
- When connecting cable which is the same thickness, do as shown in
the figure below.
- For wiring, use the designated power cable and connect firmly, then
secure to prevent outside pressure being exerted on the terminal
block.
- Use an appropriate screwdriver for tightening the terinal screws. A
screwdriver with a small head will strip the head and make proper
tighterning impossible.
- Over-tightening the terminal screws may break them.
!
CAUTION
• Use the 2-core shield cables for communication cables. Never use
them together with power cables.
• The conductive shielding layer of cable should be grounded to the
metal part of both units.
• Never use multi-core cable
• As this unit is equipped with an inverter, to install a phase leading
capacitor not only will deteriorate power factor improvement effect,
but also may cause capacitor abnormal heating. Therefore, never in-
stall a phase leading capacitor.
• Make sure that the power unbalance ratio is not greater than 2%. If
it is greater the units lifespan will be reduced.
!
Control box and connecting position of wiring
- Remove all of the screws at front panel and remove the panel by
pulling it forward.
- Connect communication cable between main and sub outdoor unit
through the terminal block.
- Connect communication cables between outdoor unit and indoor
units through the terminal block.
- When the central control system is connected to the outdoor unit, a
dedicated PCB must be connected between them.
- When connecting communication cable between outdoor unit and in-
door units with shielded cable, connect the shield ground to the earth
screw.
Front Panel