INSTALLATION
13
ENGLISH
Wrap the insulation material
around the connecting portion.
1
Overlap the connection pipe insulation ma-
terial and the indoor unit pipe insulation
material. Bind them together with vinyl
tape so that there may be no gap.
2
Set the tubing cutting line upward.
Wrap the area which accommodates the
rear piping housing section with vinyl tape.
3
Bundle the piping and drain hose together
by wrapping them with vinyl tape sufficient
enough to cover where they fit into the
rear piping housing section.
Finishing the indoor unit
installation
1
Mount the tubing holder in the original
positon.
2
Ensure that the hooks are properly seated
on the installation plate by moving it left
and right.
3
Press the lower left and right sides of the
unit against the installation plate until the
hooks engage into their slots (clicking
sound).
4
Finish the assembly by screwing the unit
to the installation plate by using two
pieces of type "C" screws. And assemble a
chassis cover.
Insulation material
Gas Pipe
Liquid Pipe
Cutting Line
Cutting Line
Good Case
B
ad Case
* Tubing cutting line have to be upward.
Vinyl tape(narrow)
Connection pipe
Connecting cable
Vinyl tape (wide)
Wrap with vinyl tape
Indoor unit pipe
Pipe
Type 'C' screw
Wrap with vinyl tape
Drain hose
Pipe
Vinyl tape(wide)
ТОО
"Everest climate",
Р
.
К
.,
г
.
Алматы
|
Телефон
: +7 727 230 00 10, +7 777 250 10 90 | www.aircon.kz, e-mail: [email protected]