CONNECTING PIPES
ENGLISH
Preparation of Piping
Main cause of gas leakage is defect in flaring work. Carry out correct flaring work in the following
procedure.
C
Cut the pipes and the cable
- Use the piping kit accessory or the pipes pur-
chased locally.
- Measure the distance between the indoor
and the outdoor unit.
- Cut the pipes a little longer than measured
distance.
- Cut the cable 1.5 m longer than the pipe
length.
Burrs removal
- Completely remove all burrs from the cut
cross section of pipe/tube.
- Put the end of the copper tube/pipe in a
downward direction as you remove burrs in
order to avoid dropping burrs into the tubing.
Putting nut on
- Remove flare nuts attached to indoor and
outdoor unit, then put them on pipe/tube
having completed burr removal.
(not possible to put them on after flaring
work)
Flaring work
- Carry out flaring work using flaring tool as
shown below.
Firmly hold copper pipe in a bar in the
dimension shown in the table below.
Check
- Compare the flared work with figure below.
- If flare is noted to be defective, cut off the
flared section and do flaring work again.
Copper
tube
90
Slanted Uneven Rough
Pipe
Reamer
Point down
Flare nut
Copper tube
Bar
Copper pipe
Clamp handle
Red arrow mark
Cone
Yoke
Handle
Bar
"A"
Inclined
Inside is shining without scratches.
Smooth all round
Even length
all round
Surface
damaged
Cracked Uneven
thickness
= Improper flaring =
Outside diameter
A
mm
inch
mm
Ø 6.35
1/4
1.1~1.3
Ø 9.52
3/8
1.5~1.7
Ø 12.7
1/2
1.6~1.8
Ø 15.88
5/8
1.6~1.8
Ø 19.05
3/4
1.9~2.1
CONNECTING PIPES
Содержание ABUW18GM1S1
Страница 1: ...P NO MFL70541911 REV 00_191115 ESPAÑOL ...
Страница 22: ...MANUAL DE INSTALACIÓN AIRE ACONDICIONADO www c ESPAÑOL c c c el El c c D c c ...
Страница 26: ...5 INSTRUCCIONES DE SEGURIDAD IMPORTANTES ESPAÑOL PRECAUCIÓN Instalación ESPAÑOL ...
Страница 43: ...1 MFL42763424 영영 17 9 5 영영 11 08 Page 100 ...