4. Trouble Shooting
- 59 -
Copyright ©2013 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
• Procedure
(1) Connect the vacuum pump to the center hose
of charge set center hose
(2) Evacuation for approximately one hour.
– Confirm that the gauge needle has moved
toward 0.8Torr.
(3) Close the valve (Lo side) on the charge set,
turn off the vacuum pump, and confirm that
the gauge needle does not move (approxima-
tely 5 minutes after turning off the vacuum
pump).
(4) Disconnect the charge hose from the vacuum
pump.
– Vacuum pump oil.
If the vacuum pump oil becomes dirty or
depleted, replenish as needed.
WARNING
Use a vacuum pump or lnert (nitrogen) gas when
doing leakage test or air purge. Do not compress
air or Oxygen and do not use Flammable gases.
Otherwise, it may cause fire or explosion.
- Otherwise, it may cause personal injury.
Lo
Open
Open
Vacuum pump
3-Way
valve
Outdoor unit
Liquid side
Indoor unit
Gas side
3-Way
valve
OPEN
Vacuum
Gage
OPEN
3. Evacuation (All amount of refrigerant leaked)
Содержание ABNH09GL1A2
Страница 146: ...P NO MFL67478301 December 2013 ...