Part 5. Trouble Shooting
- 82 -
Copyright ©2014 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Check Point
1. Check the WCN_P(L),P(N) Connection condition at the Main PCB.(Refer to outdoor wiring diagram)
2. Check the DC Link voltage at not operating(280V
↑
)
3. Check the DC Link voltage at Comp operating(340V
↑
)
4. Check DC Link Sensing Signal :2.4~2.8V (Refer the Picture)
IN/I
GND
<CT Sensing Check Point>
Black
Red
Vdc
■
36k
Содержание A2UW18GFA0
Страница 113: ...P NO MFL68280201 January 2014 ...